科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
P
Piotr Jaśkowski
warsaw university of technology
15
H指数
115
论文数
964
被引数
0
相关解读
订阅
收录论文
12
发表时间
发表时间
IF
被引数
Risk Factor Analysis of Single Motorcycle Accidents in Road Traffic
道路交通事故中单一摩托车事故的风险因素分析
Applied Sciences-Basel
IF
2.5
2026-02-05
0
OA
AI
Kozlowski, Edward; Traczynski, Mateusz; Skoczynski, Przemyslaw; Jaskowski, Piotr; Madlenak, Radovan
分享
收藏
Customized particle swarm optimization for harmonizing multi-section construction projects
基于定制粒子群算法的多施工项目协调
AUTOMATION IN CONSTRUCTION
IF
11.5
2024-06-01
2
PRE
AI
Tomczak, Michal; Jaskowski, Piotr
分享
收藏
Harmonizing construction processes in repetitive construction projects with multiple buildings
在具有多个建筑物的重复建设项目中协调建设过程
AUTOMATION IN CONSTRUCTION
IF
11.5
2022-07-01
10
PRE
AI
Tomczak, Michas; Jaskowski, Piotr
分享
收藏
SCHEDULING REPETITIVE CONSTRUCTION PROJECTS: STRUCTURED LITERATURE REVIEW
重复建设项目调度: 结构化文献综述
management in engineering
IF
3.7
2022-05-27
8
OA
AI
Tomczak, Michal; Jaskowski, Piotr
分享
收藏
Conceptual Framework of a Simulation-Based Manpower Planning Method for Construction Enterprises
SUSTAINABILITY
IF
3.3
2022-04-28
4
OA
AI
Biruk, Slawomir; Jaskowski, Piotr; Maciaszczyk, Magdalena
分享
收藏
Preferences of Construction Managers Regarding the Quality and Optimization Criteria of Project Schedules
施工经理对项目进度的质量和优化标准的偏好
SUSTAINABILITY
IF
3.3
2021-01-08
6
OA
AI
Tomczak, Michal; Jaskowski, Piotr
分享
收藏
SCHEDULING OF REPETITIVE CONSTRUCTION PROCESSES WITH CONCURRENT WORK OF SIMILARLY SPECIALIZED CREWS
management in engineering
IF
3.7
2020-06-23
7
OA
AI
Jaskowski, Piotr; Biruk, Slawomir
分享
收藏
New Approach to Improve General Contractor Crew's Work Continuity in Repetitive Construction Projects
提高重复建设项目总承包商船员工作连续性的新方法
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-05-01
24
PRE
AI
Tomczak, Michal; Jaskowski, Piotr
分享
收藏
Crashing Construction Project Schedules by Relocating Resources
通过重新分配资源来破坏建设项目进度
IEEE ACCESS
IF
3.6
2020-01-01
8
OA
AI
Tomczak, Michal; Jaskowski, Piotr
分享
收藏
REDUCING RENEWABLE RESOURCE DEMAND FLUCTUATION USING SOFT PRECEDENCE RELATIONS IN PROJECT SCHEDULING
在项目调度中使用软优先关系减少可再生资源需求波动
management in engineering
IF
3.7
2018-07-11
11
OA
AI
Jaskowski, Piotr; Biruk, Slawomir
分享
收藏
Decision model for planning material supply channels in construction
施工物资供应渠道规划决策模型
AUTOMATION IN CONSTRUCTION
IF
11.5
2018-06-01
53
PRE
AI
Jaskowski, Piotr; Sobotka, Anna; Czarnigowska, Agata
分享
收藏
Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment
模糊AHP法评估承包商选择标准权重在群决策环境中的应用
AUTOMATION IN CONSTRUCTION
IF
11.5
2010-03-01
139
PRE
AI
Jaskowski, Piotr; Biruk, Slawomir; Bucon, Robert
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
A
Anna Sobotka
H 指数: 23 · 论文数: 161
R
Radovan Madleňák
H 指数: 16 · 论文数: 134
A
Agata Czarnigowska
H 指数: 13 · 论文数: 53
S
Sławomir Biruk
H 指数: 11 · 论文数: 77
M
Michał Tomczak
H 指数: 9 · 论文数: 30
查看更多