返回
Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time
DOI:10.1080/00207543.2010.543938.png)
摘要
En 中文
Accurate cycle time is an essential planning basis required for many production applications, especially on due date commitments, performance metrics analysing, capacity planning, and scheduling. The re-entrant final testing process is the final stage of the complicated semiconductor manufacturing process. To enhance the ability of quick responses and to achieve better on-time delivery in final testing factories, it is essential to develop an accurate cycle time estimation method. In this paper, we provide a statistical approach to calculate the cycle time for multi-layer semiconductor final testing involving the sum of multiple Weibull-distributed waiting times. In addition, percentiles of the cycle time are obtained which are useful to industrial practitioners for due date commitments satisfying the targeted on-time delivery rate. To demonstrate the applicability of the proposed cycle time estimation model, a real example in a semiconductor final testing factory which is located on the Science-based Industrial Park in Hsinchu, Taiwan, is presented.
Keyword:
cycle time estimation
semiconductor final testing
Weibull distribution
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
7.3
论文数:
1.1W
被引数:
3.7W
机构
引用论文
Practical extensions to cycle time approximations.for the G/G/m-queue with applications对周期时间近似的实际扩展。对于带有应用程序的G/m队列
An intelligent mechanism for lot output time prediction and achievability evaluation in a wafer fab一种用于晶圆厂批量输出时间预测和可实现性评估的智能机制

