Float Types in Construction Spatial Scheduling
DOI:10.1061/(ASCE)CO.1943-7862.0001202.png)
摘要
En 中文
Earlier studies investigated spatial scheduling to link schedules of construction activities to workspace availability and constraints. However, previous models lacked the ability to quantify criticality in a manner similar to the critical path method. Previous spatial scheduling models did not provide seamless integration with site logistics planning of material staging and temporary facilities. This paper therefore extracts various float types that can exist in a spatial schedule. Three activity float metrics are defined using singularity functions: shift, rate, and combined floats. An algorithm is established to generate space float contours for a construction site. A validation example demonstrates the new float concepts and space float contours. This research makes two contributions to body of knowledge of construction scheduling. First, activity float metrics expand the capabilities of spatial scheduling models to assess the criticality of activities. Second, the concept of space float enables a direct integration between scheduling and other project management tasks like site layout, material logistics, and trades coordination.
Keyword:
Space scheduling
Floats
Singularity functions
Mathematical modeling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.8W
机构
引用论文
Development and validation of a new method to quantify vitexin-2-O-rhamnoside on Passiflora L. extracts开发和验证量化西番莲提取物vitexin-2-O-rhamnoside的新方法