Target costing (TC) is an effective construction management technique that has been proven to enhance project performance through the evaluation of construction component alternatives that satisfy a desired cost. However, current research focusing on the adoption of TC in the construction industry still follows a manual, time-consuming process. Improvement measures are heuristic and rely on the intuition of designers. This paper proposes a systematic framework, called target cost modeling (TCMd), for the application of TC in the construction industry to automatically generate a detailed project estimate based on a set of client requirements and a desired cost. It uses a three-level database to collect project data and generate a set of available alternatives. Value and compatibility studies govern the process of selecting among alternatives, and mathematical costing models calculate the cost accordingly. Finally, alternative value analysis improves the project value through the use of an optimization method, simulated annealing. TCMd is expected to efficiently improve project performance and enhance the design process while meeting a desired overall cost.
Keyword:
Target costing
cost estimating
regression analysis
simulated annealing optimization
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
3.9
论文数:
2.8K
被引数:
4.6K