Heuristic procedures for reactive project scheduling
DOI:10.1016/j.cie.2006.10.002.png)
摘要
En 中文
This paper describes new heuristic reactive project scheduling procedures that may be used to repair resource-constrained project baseline schedules that suffer from multiple activity duration disruptions during project execution. The objective is to minimize the deviations between the baseline schedule and the schedule that is actually realized. We discuss computational results obtained with priority-rule based schedule generation schemes, a sampling approach and a weighted-earliness tardiness heuristic on a set of randomly generated project instances. (c) 2006 Elsevier Ltd. All rights reserved.
Keyword:
project scheduling
uncertainty
stability
reactive scheduling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.5
论文数:
1.0W
被引数:
3.8W
机构
暂无机构信息
引用论文
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation重新审视串行和并行资源受限的项目调度方法: 理论和计算