The Multi-Mode Resource Constrained Project Scheduling Problem (MMRCPSP) is a challenging NP-hard optimization problem, that schedules activities under a set of resource constraints. Although, over the last few decades, different solution approaches have been proposed, no single algorithm has consistently been the best for a wide range of MMRCPSPs. In this paper, we have proposed an effective hybrid algorithm, in which two multi-operator evolutionary algorithms perform sequentially under two sub-populations, with their sizes dynamically adapted based on their performance during the evolutionary process. In addition, two heuristics are proposed, the first one is based on a linear programming approach with an aim to obtain feasible modes, while the second one is based on a modified forward and backward justification approach with an aim of obtaining feasible schedules. Also, a classification technique is used to determine the complexity of a given problem, based on its resource's availability. The proposed approach is tested by solving a wide-range of multi-mode resource-constrained project scheduling problems, including available larger test problems, with the results revealing that the proposed method outperforms well-known algorithms.
Keyword:
Evolutionary algorithm
Differential evolution
Genetic algorithm
Heuristic
Multi-mode resource constrained project scheduling problems
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6.5
论文数:
1.0W
被引数:
4.8W
机构
暂无机构信息
引用论文
A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem基于混合秩的进化算法应用于多模式资源受限项目调度问题