返回
Improving cost estimation in construction projects
DOI:10.1080/15623599.2020.1853657.png)
摘要
En 中文
The accurate cost estimate is one of the success keys to construction projects. The influence of inaccurate cost estimation on construction projects is critical. There is no consensus among researchers about the most important factors influencing the cost estimate accuracy. The study's objective is to get an accurate cost estimate because the precise cost estimate keeps all parties focused on delivering the project within the budget. This objective is achieved by collecting the influential factors from the literature review and creating a powerful arithmetical model of cost estimation. Twenty-nine factors were collected by reviewing many researches. A questionnaire was prepared and then was examined by fourteen project managers. Pareto technique was conducted to get the foremost influential factors. Based on the Pareto technique, the 29 factors were reduced to nine. Then, a powerful arithmetical model was created in this study to get an accurate cost estimate. Finally, fourteen finished projects were selected to be case studies. The cost variance percentages were between 1% and 15% for each case study. By using the model, the estimated contract value of each case study was recalculated and, the cost variance percentages were between 0.5% and 0.8% for each case study.
Keyword:
Cost estimation
questionnaire
Pareto technique
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
3.9
论文数:
2.8K
被引数:
4.6K
机构
引用论文
Single and double pain responses to individually titrated ultra-short laser stimulation in humans单次和多次疼痛反应对个体化滴定超短激光刺激的反应研究
Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model通过在基于案例的推理模型中修改分类变量来提高早期成本估算的准确性
没有更多内容