科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
K
Karim El-Dash
Benha University
13
H指数
62
论文数
570
被引数
0
相关解读
订阅
收录论文
14
发表时间
发表时间
IF
被引数
Using Factor Analysis and Regression Technique to Predict Cost Overrun in Road Network Construction Projects
运用因子分析和回归技术预测道路网络建设项目的成本超支
Scientific African
IF
3.3
2026-01-02
0
OA
AI
Taher Ammar; Mohamed Abdel-Monem; Karim El-Dash
分享
收藏
Regression-based model predicting cost contingencies for road network projects
international entrepreneurship and management journal
IF
3.4
2024-10-10
3
PRE
AI
Ammar, Taher; Abdel-Monem, Mohamed; El-Dash, Karim
分享
收藏
Appropriate budget contingency determination for construction projects: State-of-the-art
ALEXANDRIA ENGINEERING JOURNAL
IF
6.8
2023-09-01
6
OA
AI
Ammar, Taher; Abdel-Monem, Mohamed; El-Dash, Karim
分享
收藏
Cost optimization of sewage pipelines inspection
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2023-05-01
5
OA
AI
Mohamed, Mohamed Abdel-Hamid; Ramadan, Marwa Adel; El-Dash, Karim M.
分享
收藏
The major problems between main contractors and subcontractors in construction projects in Egypt
埃及建设项目中主承包商与分包商之间的主要问题
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2022-11-01
8
OA
AI
Kshaf, Dalia A.; Mohamed, Mohamed A.; El-Dash, Karim M.
分享
收藏
Risk factors causing cost overruns in road networks
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2022-09-01
12
PRE
AI
Ammar, Taher; Abdel-Monem, Mohamed; El-Dash, Karim
分享
收藏
Assessing Risk Factors Affecting the Accuracy of Conceptual Cost Estimation in the Middle East
BUILDINGS
IF
3.1
2022-07-04
12
OA
AI
Abdel-Monem, Mohamed; Alshaer, Kareem Tarek; El-Dash, Karim
分享
收藏
Implementation of a Life Cycle Cost Deep Learning Prediction Model Based on Building Structure Alternatives for Industrial Buildings
BUILDINGS
IF
3.1
2022-04-19
7
OA
AI
Meshref, Ahmed; El-Dash, Karim; Basiouny, Mohamed; El-Hadidi, Omia
分享
收藏
Impact of sustainable design in the construction sector on climate change
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2021-06-01
31
OA
AI
Ahmed, Noha; Abdel-Hamid, Mohamed; Abd El-Razik, Mahmoud M.; El-Dash, Karim M.
分享
收藏
FACTORS CAUSING REWORK AND THEIR IMPACT ON PROJECTS' PERFORMANCE IN EGYPT (vol 26, pg 666, 2020)
导致返工的因素及其对埃及项目绩效的影响 (第26卷,666页,2020)
management in engineering
IF
3.7
2021-01-08
0
OA
AI
Al-Janabi, Assim Muwafaq; Abdel-Monem, Mohamed Shawky; El-Dash, Karim Mohamed
分享
收藏
Improving cost estimation in construction projects
international entrepreneurship and management journal
IF
3.4
2020-12-04
20
PRE
AI
Sayed, Mohamed; Abdel-Hamid, Mohamed; El-Dash, Karim
分享
收藏
Economic investigation for building a high-speed rail in developing countries: The case of Egypt
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2020-12-01
5
OA
AI
Belal, Eslam M.; Khalil, Ahmed A.; El-Dash, Karim M.
分享
收藏
FACTORS CAUSING REWORK AND THEIR IMPACT ON PROJECTS' PERFORMANCE IN EGYPT
management in engineering
IF
3.7
2020-08-21
26
OA
AI
Al-Janabi, Assim Muwafaq; Abdel-Monem, Mohamed Shawky; El-Dash, Karim Mohamed
分享
收藏
Float loss impact on project cost
international entrepreneurship and management journal
IF
3.4
2020-04-08
0
PRE
AI
Magdy, Mohamed; Abdel-Monem, Mohamed; El Dash, Karim
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
M
Mohamed A. El Sayed
H 指数: 18 · 论文数: 59
M
Mohamed A. Mohamed
H 指数: 14 · 论文数: 45
M
Mohamed Abd‐Elmonem
H 指数: 12 · 论文数: 53
A
Ahmed Nouh Meshref
H 指数: 9 · 论文数: 24
M
Mohamed A. Basiouny
H 指数: 8 · 论文数: 48
查看更多