Integrated resource leveling and material procurement with variable execution intensities

delete2020-10-01
delete11
PRE
AI
S
Sajad Kazemi
H
Hamed Davari‐Ardakani *
DOI:10.1016/j.cie.2020.106673delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This paper addresses the concurrent planning of resource leveling and material ordering, aiming to minimize the completion time of the project and the total cost of project execution. The latter is comprised of material ordering, purchase and holding costs as well as the cost of fluctuations in resource utilization. All activities of the project are performed regarding variable execution intensities, which means that the effort spent to execute an activity is considered to vary over time. A bi-objective mixed-integer linear programming model is proposed to deal with the above-mentioned time-cost trade-off problem. The proposed model determines the start time of activities, the fraction of executing activities in each time period as well as the quantity and timing of orders for materials, while satisfying precedence relationships among activities. The problem belongs to the class of NPhard problems. Hence, a genetic algorithm as well as two multi-objective meta-heuristic algorithms, namely nondominated sorting genetic algorithm II (NSGA-II) and multi-objective vibration damping optimization (MOVDO) algorithm, calibrated by Taguchi method, are utilized to solve 30 different sized test problems. Then, four performance metrics are used to assess the performance of both NSGA-II and MOVDO algorithms. Results show that MOVDO outperforms NSGA-II in the small-, medium- and large-sized test problems. Moreover, a sensitivity analysis on different-sized test problems, using MOVDO, shows that when the durations of activities are considered to be flexible, the Pareto front is significantly improved in terms of objective values, and the number of Pareto-optimal solutions (NPS) increases. This helps the project manager(s) make decisions on the schedule and the execution intensity of activities and material procurement in a more flexible manner.
Keyword:
Resource leveling problem (RLP)
Material ordering problem (MOP)
Variable execution intensity (VEI)
Genetic algorithm (GA)
Non-dominated sorting genetic algorithm II (NSGA-II)
Multi-objective vibration dampingoptimization (MOVDO)
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

K
Kharazmi University
学者数:
2.3K
论文数: 2.1K
被引数: 2.1K
引用论文

引用论文

Searching for dark photons with existing haloscope data
err2021-11-30
err0
errOAAI
errSumita Ghosh; E. P. Ruddy; M. J. Jewell; A. F. Leder; R. H. Maruyama
err分享
err收藏
c‐Fos expression in preoptic nuclei as a marker of sleep rebound in the rat
err2009-08-24
err0
errOAAI
errDaniela Dentico; Roberto Amici; Francesca Baracchi; Matteo Cerri; Elide Del Sindaco; Marco Luppi; Davide Martelli; Emanuele Perez; Giovanni Zamboni
err分享
err收藏
Upper extremity improvements in chronic stroke: Coupled bilateral load training
err2009-01-01
err0
errOAAI
errJames H. Cauraugh; Stephen A. Coombes; Neha Lodha; Sagar K. Naik; Jeffery J. Summers
err分享
err收藏
Effect of Intravenous Ondansetron on the QT Interval of Patients' Electrocardiograms
err2018-01-01
err0
PREAI
errSarah Kline Krammes; Todd Jacobs; John M. Clark; R. Esther Lutes
err分享
err收藏
学者 查看更多内容