Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators
DOI:10.1061/(ASCE)CO.1943-7862.0001450.png)
摘要
En 中文
This paper presents a novel construction project planning model that allows more-efficient and more-realistic planning than current methods. Unlike scheduling methods such as the critical path method (CPM), the proposed model represents spatial entities on the construction site, such as work areas and safety buffers. The model uses Boolean operators to allow the codification of the actual constraints that guide construction projects and to create a single integrated temporal-spatial model. Singularity functions are used for the mathematical definition of the constructs and their relationships, providing a flexible modeling framework. The model is implemented in a real-world case study with input data from building information modeling, demonstrating its feasibility and usefulness.
Keyword:
Construction scheduling
Building information modeling
Work paths
Work areas
Spatial relationships
Boolean logical operators
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Impacts of prescribed burning on Sphagnum mosses in a long-term peatland field experiment
PLOS ONE
IF0
Urothelial Dysfunction and Increased Suburothelial Inflammation of Urinary Bladder Are Involved in Patients with Upper Urinary Tract Urolithiasis – Clinical and Immunohistochemistry Study
PLoS ONE
IF0