MACHINE LEARNING - BASED FRAMEWORK FOR CONSTRUCTION DELAY MITIGATION

delete2021-07-20
delete9
delete
OA
AI
M
Muizz O. Sanni-Anibire *
R
Rosli Mohamad Zin
S
Sunday O. Olatunji
DOI:10.36680/j.itcon.2021.017delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The construction industry, for many decades, has been underperforming in terms of the success of project delivery. Construction delays have become typical of many construction projects leading to lawsuits, project termination, and ultimately dissatisfied stakeholders. Experts have highlighted the lack of adoption of modern technologies as a cause of underproductivity. Nevertheless, the construction industry has an opportunity to tackle many of its woes through Construction 4.0, driven by enabling digital technologies such as machine learning. Consequently, this paper describes a framework based on the application of machine learning for delay mitigation in construction projects. The key areas identified for machine learning application include cost estimation, duration estimation, and delay risk assessment. The developed framework is based on the CRISP-DM graphical framework. Relevant data were obtained to implement the framework in the three key areas identified, and satisfactory results were obtained. The machine learning methods considered include Multi Linear Regression Analysis, K-Nearest Neighbours, Artificial Neural Networks, Support Vector Machines, and Ensemble methods. Finally, interviews with professional experts were carried out to validate the developed framework in terms of its applicability, appropriateness, practicality, and reliability. The main contribution of this research is in its conceptualization and validation of a framework as a problem-solving strategy to mitigate construction delays. The study emphasized the cross-disciplinary campaign of the modern construction industry and the potential of machine learning in solving construction problems.
Keyword:
machine learning
construction delays
construction 4.0
delay mitigation
risk assessment
cost estimation
duration estimation

期刊

J
Journal of Information Technology in Construction
IF:
3.8
论文数:
285
被引数:
1.6K

机构

I
Imam Abdulrahman Bin Faisal University
学者数:
6.3K
论文数: 4.5K
被引数: 5.4K
U
Universiti Teknologi Malaysia
学者数:
1.4W
论文数: 1.1W
被引数: 85
引用论文

引用论文

err分享
err收藏
Ethnicity and thrombolysis in ischemic stroke: a hospital based study in Amsterdam
err2011-06-30
err0
errOAAI
errJonathan M Coutinho; Eva C Klaver; Yvo B Roos; Jan Stam; Paul J Nederkoorn
err分享
err收藏
Survival of Curvularia lunata var. aeria in soil
err1980-01-01
err0
PREAI
errEl Nur El Amin; Mahgoub H. Abdalla
err分享
err收藏
Machine learning model for delay risk assessment in tall building projects
err2020-05-25
err31
PREAI
errSanni-Anibire, Muizz O.; Zin, Rosli Mohamad; Olatunji, Sunday Olusanya
err分享
err收藏
学者 查看更多内容