Minmax scheduling problems with a common due-window
DOI:10.1016/j.cor.2008.06.001.png)
摘要
En 中文
This paper focuses on a minmax due-window assignment problem. The goal is to schedule the jobs and the due-window such that the highest cost among all jobs is minimized. The objective function contains four cost components: for earliness, tardiness, due-window starting time and due-window size. We present a polynomial time solution for the case of a single machine and for a two-machine flow-shop. The cases of parallel identical machines and uniform machines are NP-hard, and simple heuristics and lower bounds are introduced and tested numerically.
Keyword:
Scheduling
Earliness-tardiness
Common due-window
Minmax
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
4.3
论文数:
6.5K
被引数:
1.8W
机构
引用论文
Diverse regulatory activity of human heat shock proteins 60 and 70 on endotoxin-induced inflammation
A survey of the state-of-the-art of common due date assignment and scheduling research对通用到期日分配和计划研究的最新进展的调查
Growth of Dialium guineense Willd Seedlings and Changes in Some Chemical Properties in Soil Amended with Brewery Effluent西非紫荆木(Dialium guineense Willd)幼苗的生长及用啤酒厂废水改良土壤后某些化学性质的变化
没有更多内容