Multiobjective Construction Schedule Optimization Using Modified Niched Pareto Genetic Algorithm

delete2016-03-01
delete33
PRE
AI
K
Kyungki Kim *
Y
Yong K. Cho
DOI:10.1061/(ASCE)ME.1943-5479.0000374delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
A construction schedule must satisfy multiple project objectives that often conflict with each other. While several earlier approaches attempted to generate optimal schedules in terms of several criteria, most of their optimization processes were segmented into multiple steps. Owing to such a lack of simultaneous optimization, limited alternative solutions could be searched and some trade-offs between goals could not be identified. This paper presents an optimization approach that enables a simultaneous search for an optimal construction schedule in terms of three objectives: minimization of construction duration, cost, and resource fluctuation. A multiobjective optimization (MOO) approach was adopted to generate scheduling solutions considering all those objectives. To enable a simultaneous optimization, we propose a new data structure that can compute the performances of solutions in terms of all the objectives at the same time. A Niched Pareto Genetic Algorithm (NPGA) is modified to facilitate the optimization procedure. Then the proposed optimization approach is implemented in an existing case study. The result indicates that the proposed approach has the capability to explore and generate a greater range of solutions compared to existing models. Trade-offs between all three objectives are identified, limitations and further research needs are discussed. (C) 2015 American Society of Civil Engineers.
Keyword:
Genetic algorithm
Construction schedule
Optimization
Multiobjective optimization
Cost
Duration
Resource leveling
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

J
Journal of Management in Engineering
IF:
7
论文数:
3.1K
被引数:
6.8K

机构

G
Georgia Institute of Technology
学者数:
1.8W
论文数: 1.4W
被引数: 5.9W
U
university system of georgia
学者数:
7.3W
论文数: 6.6W
被引数: 101
T
Texas A&M University System
学者数:
4.4W
论文数: 4.0W
被引数: 4.0K
学者 查看更多机构
引用论文

引用论文

Isolation and molecular identification of <i>Vibrio</i> spp. by sequencing of 16S rDNA from seafood, meat and meat products in Libya
err2016-03-08
err0
errOAAI
errSM Azwai; EA Alfallani; SK Abolghait; AM Garbaj; HT Naas; AA Moawad; FT Gammoudi; HM Rayes; I Barbieri; IM Eldaghayes
err分享
err收藏
A series of new polynuclear lanthanide(III) clusters prepared in alkylol amine
err2020-01-01
err0
PREAI
errLi-li Yang; Jian Zhou; Hua-Hong Zou; Feilong Hu; Jun-Wei Zhao
err分享
err收藏
CCD: Efficient Customized Content Dissemination in Distributed Publish/Subscribe
err2009-01-01
err0
errOAAI
errHojjat Jafarpour; Bijit Hore; Sharad Mehrotra; Nalini Venkatasubramanian
err分享
err收藏
err分享
err收藏
学者 查看更多内容