Multiobjective Optimization Model for Planning Repetitive Construction Projects
DOI:10.1061/(ASCE)CO.1943-7862.0002072.png)
摘要
En 中文
Minimizing the duration of repetitive construction projects such as high-rise buildings and highway construction often requires interrupting the work continuity of construction crews and/or utilizing overtime hours. Available scheduling models for repetitive construction projects can generate optimal trade-offs between minimizing project duration and crew work interruptions; however, they are incapable of minimizing the use of overtime hours. This paper developed a novel multiobjective optimization model for repetitive construction projects that is capable of generating optimal trade-offs among project duration, work interruptions, and overtime use. The model was developed in three main phases (1) a formulation phase that identified all relevant decision variables and formulated the three objective functions of the model; (2) an implementation phase that executed the model computations using multiobjective genetic algorithms; and (3) a performance evaluation phase. The results of this performance evaluation confirmed that the model outperforms existing models in minimizing the use of overtime hours, and generating optimal trade-offs among project duration, crew work interruptions, and overtime use. (C) 2021 American Society of Civil Engineers.
Keyword:
COST OPTIMIZATION
CPM/LOB
LINE
CPM
期刊
J
IF:
5.1
论文数:
5.1K
被引数:
1.4W
机构
引用论文
Green manuring relocates microbiomes in driving the soil functionality of nitrogen cycling to obtain preferable grain yields in thirty years绿肥重新定位了微生物群,以驱动氮循环的土壤功能,从而在30年内获得更好的谷物产量
Multiobjective evolutionary algorithms: A comparative case study and the Strength Pareto approach多目标进化算法: 比较案例研究和强度帕累托方法
Minimizing duration and crew work interruptions of repetitive construction projects最大限度地减少重复建设项目的工期和人员工作中断
Optimized scheduling and buffering of repetitive construction projects under uncertainty不确定条件下重复建设项目的优化调度与缓冲