Forecasting resource requirements for new product development (NPD) projects is essential for both strategic and tactical planning. Sophisticated, elegant planning tools to present data and inform decision-making do exist. However, in NPD, such tools run on unreliable, estimation-based resource information derived through undefined processes. This paper establishes that existing methods do not provide transparent, consistent, timely or accurate resource planning information, highlighting the need for a new approach to resource forecasting, specifically in the field of NPD. The gap between the practical issues and available methods highlights the possibility of developing a novel design of experiments approach to create resource forecasting models.
Keyword:
COST-ESTIMATION
SOFTWARE
MANAGEMENT
PORTFOLIO
DESIGN
UNCERTAINTY
SYSTEMS
VIEW
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
J
IF:
9
论文数:
3.8K
被引数:
3.7W
机构
引用论文
Functional Studies on Platelet Adhesion With Recombinant von Willebrand Factor Type 2B Mutants R543Q and R543W Under Conditions of Flow
Blood
IF0
Dimensions of uncertainty and their moderating effect on new product development project performance
management
IF5.7