Parallel-machine scheduling with machine unavailability to maximize total early work

delete2025-10-01
delete0
PRE
AI
K
Ke Chen
X
Xiaoyu Shi
D
Danli Yao
T
T.C.E. Cheng
M
Min Ji *
DOI:10.1080/01605682.2025.2565464delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This article considers a parallel-machine scheduling problem in which machines are unavailable to process jobs for a specified period. The objective is to maximize the total amount of early work, where the early work of a job is the amount of processing time performed before its due date. Since this problem is NP-hard, we propose a pseudo-polynomial time dynamic programming algorithm, and based on it, we further provide a fully polynomial time approximation scheme. The time complexity of these two algorithms is relatively high; to this end, we also offer a 2-approximation ratio heuristic algorithm to help solve large-scale problems, and we show that the bound is tight.
Keyword:
Parallel machine
early work maximization
dynamic programming
approximation algorithm
FPTAS

期刊

Journal of the Operational Research Society 封面图
Journal of the Operational Research Society
IF:
2.7
论文数:
449
被引数:
9.2K

机构

Z
Zhejiang Gongshang University
学者数:
6.6K
论文数: 4.9K
被引数: 8.1K
T
The Hong Kong Polytechnic University
学者数:
5.1K
论文数: 3.0K
被引数: 17
S
Shanghai Business School
学者数:
306
论文数: 456
被引数: 481
U
university of shanghai for science and technology
学者数:
6.0K
论文数: 2.3K
被引数: 4
学者 查看更多机构
引用论文

引用论文

暂无论文信息