返回
Scheduling experiments on a nuclear reactor using mixed integer programming
DOI:10.1016/S0305-0548(00)00023-X.png)
摘要
En 中文
This paper describes an approach for scheduling a nuclear reactor that irradiates samples as required by customers. The environment involves a flowshop that consists of two stations, each composed of a set of parallel machines. Some jobs may be preempted, while others may not. Some jobs have deadlines, while others have due-dates. Some jobs require special tooling, while others do not. The problem is modeled as a time-indexed, mixed integer program with the objective of minimizing weighted tardiness. Pre-processing eliminates unnecessary variables and five solution strategies - four optimizing and one heuristic - are devised to utilize the options provided by a commercial solver. The strategies are compared on a set of 25 ten-job test instances. Jobs were selected randomly from a database of 103 actual jobs. One particular optimizing strategy worked especially well - it optimized 80% of the test problems within a predetermined time limit and did so with an average run-time of less than 1 min. (C) 2001 Elsevier Science Ltd. All rights reserved.
Keyword:
resource constrained scheduling
mixed integer programming
flowshop
parallel machines
heuristic
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
4.3
论文数:
6.5K
被引数:
2.3W
机构
暂无机构信息
引用论文
Translation, Validation and Cross-Cultural Adaptation of a Simplified-Chinese Version of the Tegner Activity Score in Chinese Patients with Anterior Cruciate Ligament Injury
PLOS ONE
IF0

