arrow
返回

Scheduling flexible flow lines with sequence-dependent setup times

delete2004-11-01
delete206
delete
OA
AI
M
Mary E. Kurz
R
Ronald G. Askin
DOI:10.1016/S0377-2217(03)00401-6delete
delete原文链接
delete分享
delete收藏
查看原文
摘要

摘要

En 中文
This paper examines scheduling in flexible flow lines with sequence-dependent setup times to minimize makespan. This type of manufacturing environment is found in industries such as printed circuit board and automobile manufacture. An integer program that incorporates these aspects of the problem is formulated and discussed. Because of the difficulty in solving the IP directly, several heuristics are developed, based on greedy methods, flow line methods, the Insertion Heuristic for the Traveling Salesman Problem and the Random Keys Genetic Algorithm. Problem data is generated in order to evaluate the heuristics. The characteristics are chosen to reflect those used by previous researchers. A lower bound has been created in order to evaluate the heuristics, and is itself evaluated. An application of the Random Keys Genetic Algorithm is found to be very effective for the problems examined. Conclusions are then drawn and areas for future research are identified. (C) 2003 Elsevier B.V. All rights reserved.
Keyword:
scheduling
heuristics
genetic algorithms
flexible flow lines
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

暂无机构信息
引用论文

引用论文

Correlates of sedentary behaviour in 8- to 10-year-old children at elevated risk for obesity
err2015-01-01
err0
PREAI
errKatya M. Herman; Catherine M. Sabiston; Marie-Eve Mathieu; Angelo Tremblay; Gilles Paradis
err分享
err收藏
err分享
err收藏
err分享
err收藏
学者 查看更多内容