科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
M
Mary E. Kurz
Clemson University
18
H指数
66
论文数
1.6K
被引数
0
相关解读
订阅
收录论文
19
发表时间
发表时间
IF
被引数
Mixed-model sequencing with stochastic failures: A case study for automobile industry
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2024-11-01
0
OA
AI
Yilmazlar, I. Ozan; Kurz, Mary E.; Rahimian, Hamed
分享
收藏
Mixed-model sequencing with reinsertion of failed vehicles: a case study for automobile industry
带有故障车辆重新插入的混合模型排序: 汽车行业的案例研究
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2024-04-22
0
OA
AI
Yilmazlar, I. Ozan; Kurz, Mary E.; Rahimian, Hamed
分享
收藏
Hybrid multi-objective evolutionary meta-heuristics for a parallel machine scheduling problem with setup times and preferences
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2023-11-01
3
PRE
AI
Srinath, Nitin; Yilmazlar, I. Ozan; Kurz, Mary E.; Taaffe, Kevin
分享
收藏
Adaptive local search algorithm for solving car sequencing problem
求解汽车排序问题的自适应局部搜索算法
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2023-06-01
8
PRE
AI
Yilmazlar, I. Ozan; Kurz, Mary E.
分享
收藏
Introducing preferences in scheduling applications
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2022-01-01
4
PRE
AI
Srinath, Nitin; Yilmazlar, I. Ozan; Kurz, Mary E.; Taaffe, Kevin
分享
收藏
Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2019-02-12
34
PRE
AI
Wang, Shasha; Kurz, Mary; Mason, Scott Jennings; Rashidi, Eghbal
分享
收藏
An effective integer program for a general assembly line balancing problem with parallel workers and additional assignment restrictions
具有并行工人和附加分配限制的一般装配线平衡问题的有效整数程序
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2019-01-01
27
PRE
AI
Pearce, Bryan W.; Antani, Kavit; Mears, Laine; Funk, Kilian; Mayorga, Maria E.; Kurz, Mary E.
分享
收藏
On scheduling a photolithography area containing cluster tools
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2018-07-01
10
OA
AI
Madathil, Sreenath Chalil; Nambiar, Siddhartha; Mason, Scott J.; Kurz, Mary E.
分享
收藏
Configuration and options management processes and tools: an automotive OEM case study
JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT
IF
6
2017-03-06
6
PRE
AI
Phelan, Keith T.; Summers, Joshua David; Kurz, Mary E.; Wilson, Crystal; Pearce, Bryan Wayne; Schulte, Joerg; Knackstedt, Stephan
分享
收藏
Supply network design: Risk-averse or risk-neutral?
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2014-12-01
36
PRE
AI
Madadi, AliReza; Kurz, Mary E.; Taaffe, Kevin M.; Sharp, Julia L.; Mason, Scott J.
分享
收藏
An interactive memetic algorithm for production and manufacturing problems modelled as a multi-objective travelling salesman problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2012-10-15
6
PRE
AI
Samanlioglu, F.; Ferrell, W. G.; Kurz, M. E.
分享
收藏
Multi-objective analysis of an integrated supply chain scheduling problem
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2012-05-15
53
PRE
AI
Cakici, Eray; Mason, Scott J.; Kurz, Mary E.
分享
收藏
Heuristic scheduling of parallel machines with sequence-dependent set-up times
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2010-11-14
78
PRE
AI
Kurz, ME; Askin, RG
分享
收藏
Metaheuristics for assortment problems with multiple quality levels
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2010-10-01
6
PRE
AI
McElreath, Mark H.; Mayorga, Maria E.; Kurz, Mary E.
分享
收藏
A memetic random-key genetic algorithm for a symmetric multi-objective traveling salesman problem
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2008-09-01
63
PRE
AI
Samanlioglu, Funda; Ferrell, William G., Jr.; Kurz, Mary E.
分享
收藏
Minimizing total weighted tardiness on a batch-processing machine with incompatible job families and job ready times
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2007-11-16
25
PRE
AI
Kurz, Mary E.; Mason, Scott J.
分享
收藏
A branch and bound algorithm to minimise total weighted tardiness on a single batch processing machine with ready times and incompatible job families
一种分支定界算法,可最大程度地减少具有就绪时间和不兼容作业系列的单个批处理机器上的总加权迟到
PRODUCTION PLANNING & CONTROL
IF
5.4
2007-02-21
22
PRE
AI
Tangudu, S. K.; Kurz, M. E.
分享
收藏
Scheduling flexible flow lines with sequence-dependent setup times
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2004-11-01
206
OA
AI
Kurz, ME; Askin, RG
分享
收藏
Comparing scheduling rules for flexible flow lines
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS
IF
10
2003-09-01
127
PRE
AI
Kurz, ME; Askin, RG
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
S
Scott J. Mason
H 指数: 36 · 论文数: 144
M
María E. Mayorga
H 指数: 35 · 论文数: 165
R
Ronald G. Askin
H 指数: 33 · 论文数: 126
J
Julia L. Sharp
H 指数: 30 · 论文数: 250
L
Laine Mears
H 指数: 29 · 论文数: 247
查看更多