Scheduling Optimization of Linear Schedule with Constraint Programming
DOI:10.1111/mice.12277.png)
摘要
En 中文
In recent decades, construction project scheduling optimization has received extensive attention from the research community. However, the most commonly used scheduling approach, the critical path method, is often inapplicable to transportation-type linear projects. Recently, the linear scheduling method (LSM) has demonstrated many advantages for such projects and has become a popular research subject. As a relatively novel scheduling method, LSM requires further improvement, as there are restrictions associated with the scheduling/optimization of linear projects. By analyzing results from previous studies, we propose a unique three-element mode, a description method for LSM's logical relationships and constraints system. An LSM-based scheduling optimization model based on constraint satisfaction problems and constraint programming is then proposed that could be used in classical scheduling optimization problems with flexibility, practicability, and solution superiority. The proposed model is verified using three practical transportation construction projects. Verification under six optimization scenarios demonstrates the advantages of our approach.
Keyword:
NEURAL DYNAMICS MODEL
RESOURCE-ALLOCATION
STRUCTURAL OPTIMIZATION
GENETIC ALGORITHMS
COST OPTIMIZATION
CONSTRUCTION
MANAGEMENT
PROJECTS
NETWORK
PATH
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
9.1
论文数:
2.0K
被引数:
10.0K
机构
引用论文
Advanced linear scheduling program with varying production rates for pipeline construction projects用于管道建设项目的具有不同生产率的高级线性调度程序
An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem多模式资源受限项目调度问题的自动算法选择方法