返回
Short-term planning optimization model for underground mines
DOI:10.1016/j.cor.2019.02.005.png)
摘要
En 中文
Scheduling activities in an underground mine is a very complex task. Precedence relations, the great number of resources and the large number of work sites are some of the reasons for this complexity. This paper presents an optimization model for short-term planning that takes into consideration all parts of the development and production as well as specific limitations on equipment and workers. A preemptive mixed integer program is used in order to produce optimal planning over a short-term time horizon. Multiple tests made with various data sets and scenarios are then presented, including a comparison to a non-preemptive model and a case study. (C) 2019 Elsevier Ltd. All rights reserved.
Keyword:
Mine planning
Production scheduling
Mixed integer programming
Short-term planning
Underground mine
Optimization
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
C
IF:
4.3
论文数:
6.5K
被引数:
1.8W
机构
引用论文
Both heterozygous and homozygous α+ thalassemias protect against severe and fatal Plasmodium falciparum malaria on the coast of Kenya
Blood
IF0

