arrow
返回

Solving large scale crew scheduling problems

delete1997-03-01
delete46
PRE
AI
C
Chu, HD
G
Gelman, E
J
Johnson, EL
DOI:10.1016/S0377-2217(96)00196-8delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
The crew pairing problem is posed as a set partitioning zero-one integer program. Variables are generated as legal pairings meeting all work rules. Dual values obtained from solving successive large linear program relaxations are used to prune the search tree. In this paper we present a graph based branching heuristic applied to a restricted set partitioning problem representing a collection of 'best' pairings. The algorithm exploits the natural integer properties of the crew pairing problem. Computational results are presented to show realized crew cost savings.
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

European Journal of Operational Research 封面图
European Journal of Operational Research
IF:
6
论文数:
2.2W
被引数:
6.4W

机构

暂无机构信息
引用论文

引用论文

Preliminary Results on Different Impedance Contrast Agents for Pulmonary Perfusion Imaging with Electrical Impedance Tomography
err2013-04-18
err0
errOAAI
errD T Nguyen; R Kosobrodov; M A Barry; W Chik; J Pouliopoulos; T I Oh; A Thiagalingam; A McEwan
err分享
err收藏