Task network-based project dynamic scheduling and schedule coordination
DOI:10.1016/j.aei.2010.07.001.png)
摘要
En 中文
The resource-constrained project scheduling problem (RCPSP) is an extensively explored area The existing RCPSP solutions tend to focus on single project scheduling problems without practical supports to address complex constraints, dynamic environments, and multi-project schedule coordination. This paper proposes a dynamic project scheduling algorithm based on partial task network heuristics. This algorithm takes time constraints. resource constraints, and particularly the changing task execution status into consideration To coordinate conflicting schedules of multiple projects, we proposed an interactive decision support process and developed new algorithms for conflict detection, conflict resolution, and impact analysis The proposed algorithms have been fully implemented and tested in a web-based aircraft maintenance management system and are being applied in construction for project scheduling and facilities maintenance management. Crown Copyright (C) 2010 Published by Elsevier Ltd All rights reserved.
Keyword:
Resource-constrained project scheduling problem (RCPSP)
Dynamic scheduling
Multi-project scheduling
Schedule coordination
Aircraft maintenance management
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
9.9
论文数:
4.4K
被引数:
1.7W
机构
引用论文
Systems integration and collaboration in architecture, engineering, construction, and facilities management: A review建筑、工程、施工和设施管理中的系统集成与协作: 综述