arrow
返回

Team based labour assignment methodology for now product development projects

delete2017-04-01
delete8
PRE
AI
S
Serdar Baysan *
M
Mehmet Bülent Durmuşoğlu
D
Didem Çınar
DOI:10.1016/j.cie.2016.11.032delete
delete原文链接
delete原文求助
delete分享
delete收藏
摘要

摘要

En 中文
This study explores the organizational aspects of new product development projects and proposes a new team-based labour assignment methodology. The proposed hierarchical methodology focusses on the project value stream and aims to shorten lead time through waste reduction. Lean product development tools, such as clustering and design structure matrix tools, are integrated with the methodology. A detailed real-life case study is presented and the proposed methodology is evaluated using discrete event simulation. Experiment results show that the proposed methodology and team-based structure provide superior lead time performance when compared to conventional organizational setting. This study contributes to existing literature by presenting evidence of the effect of teams on NPD lead time performance. (C) 2016 Elsevier Ltd. All rights reserved.
Keyword:
Product development
Teams
Lean
Value stream mapping
Design structure matrix
Simulation
AI总结

AI总结

对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。

期刊

Computers and Industrial Engineering 封面图
Computers and Industrial Engineering
IF:
6.5
论文数:
1.0W
被引数:
3.8W

机构

I
Istanbul Technical University
学者数:
8.9K
论文数: 7.8K
被引数: 7.9K
引用论文

引用论文

err分享
err收藏
Luftbrunnenanlage des Burgtheaters Wien: Nachhaltige Klimatisierungsstrategien
err2021-02-03
err0
PREAI
errGünther Kain; Friedrich Idam; Alfons Huber; Markus Goldsteiner
err分享
err收藏
Assessment and treatment of breakthrough cancer pain: from theory to clinical practice
err2017-09-01
err0
errOAAI
errRenato Vellucci; Rocco Domenico Mediati; Silvia Gasperoni; Massimo Mammucari; Franco Marinangeli; Patrizia Romualdi
err分享
err收藏
学者 查看更多内容