返回
Using metaheuristics in multiobjective resource constrained project scheduling
DOI:10.1016/S0377-2217(99)00163-0.png)
摘要
En 中文
Although single objective metaheuristics are widely spread and applied in many combinatorial optimisation problems, only very recently have multiobjective metaheuristics (MOMH) been designed and used in practice. They aim at obtaining good approximations of the set of nondominated solutions of a problem, in an efficient way. In this work, we have applied multiobjective versions of simulated annealing and taboo search to the resource constrained project scheduling problem (RCPSP), in order to minimise the makespan, the weighted lateness of activities and the violation of resource constraints. Computational experience performed on randomly generated instances shows that this general approach is flexible, effective and able to deal with multiple objectives and with variations in the problem structure. (C) 2000 Elsevier Science B.V. All rights reserved.
Keyword:
multiobjective metaheuristics
multiobjective combinatorial optimisation
resource constrained project scheduling
AI总结
对已上传原文的论文进行重点信息的提取,主要内容包括:简要概述、研究摘要、背景介绍、关键亮点、图文解析、展望与总结。
期刊
IF:
6
论文数:
2.2W
被引数:
6.4W
机构
暂无机构信息

