Activity networks determine project performance

delete2023-01-10
delete5
delete
OA
AI
A
Alexei Vázquez
I
Iacopo Pozzana
G
Georgios Kalogridis
C
Christos Ellinas *
DOI:10.1038/s41598-022-27180-0delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
Projects are characterised by activity networks with a critical path, a sequence of activities from start to end, that must be finished on time to complete the project on time. Watching over the critical path is the project manager's strategy to ensure timely project completion. This intense focus on a single path contrasts the broader complex structure of the activity network, and is due to our poor understanding on how that structure influences this critical path. Here, we use a generative model and detailed data from 77 real world projects (+ $10 bn total budget) to demonstrate how this network structure forces us to look beyond the critical path. We introduce a duplication-split model of project schedules that yields (i) identical power-law in- and-out degree distributions and (ii) a vanishing fraction of critical path activities with schedule size. These predictions are corroborated in real projects. We demonstrate that the incidence of delayed activities in real projects is consistent with the expectation from percolation theory in complex networks. We conclude that delay propagation in project schedules is a network property and it is not confined to the critical path.
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Scientific Reports cover
Scientific Reports
IF:
3.9
Papers:
27.8W
Citations:
83.5W

Organization

No organization information available