arrow
Return

Approximation algorithms for bi-objective parallel-machine scheduling in green manufacturing

delete2023-02-01
delete7
PRE
AI
Y
Yiwei Jiang
X
Xuelian Tang
K
Kai Li
T
T.C.E. Cheng
M
Min Ji *
DOI:10.1016/j.cie.2022.108949delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
We consider bi-objective parallel-machine scheduling in green manufacturing to minimize the makespan and total processing cost. Each machine has a different constant processing cost per unit time. For the objective of minimizing the makespan, given a total cost budget, we provide an approximation algorithm with a worst-case ratio of root 33+1/4 approximate to 1.686, which improves the previous bound of 2. For the objective of minimizing the total processing cost, subject to all the jobs must be completed before a given common deadline, we provide an approximation algorithm with a worst-case ratio of 2+r/3, where r is the ratio of the maximum to the minimum processing cost per unit time on a machine.
Keywords:
Green manufacturing
Parallel-machine scheduling
Approximation algorithm
Worst-case ratio

Journal

Computers and Industrial Engineering cover
Computers and Industrial Engineering
IF:
6.5
Papers:
1.0W
Citations:
3.8W

Organization

H
hefei university of technology
Scholars:
2.5W
Papers: 1.7W
Citations: 35
Z
Zhejiang Gongshang University
Scholars:
6.6K
Papers: 4.9K
Citations: 8.1K