Return
Developing a knowledge map for construction scheduling using a novel approach
DOI:10.1016/j.autcon.2007.02.005.png)
Abstract
En 中文
A knowledge map is a vital tool for better knowledge management and learning. While application of knowledge maps in the construction domain remains in the initial stages of development, the construction industry is experience-oriented and therefore suited to knowledge maps. This study presents a novel approach for developing a knowledge map for construction scheduling. According to framework-based classification, this study utilizes a science-specific search engine to search for literature on construction scheduling knowledge. Search results are then used to develop a file cabinet knowledge map consisting of a contour map, and several trend and density charts. This map representation compensates for the lack of various meanings in a single knowledge map. For novices interested in learning construction scheduling knowledge, results of this study provide constructive information to know the key issues and research trends in the construction domain. In summary, this study presents a suitable procedure for extracting knowledge from public knowledge sources for development of a knowledge map. The proposed approach can be used for rapid generation of knowledge maps. (c) 2007 Elsevier B.V. All rights reserved.
Keywords:
knowledge map
knowledge management
construction management
scheduling technique
Journal
IF:
11.5
Papers:
6.3K
Citations:
4.2W
Organization
No organization information available
Cited Papers
Urothelial Dysfunction and Increased Suburothelial Inflammation of Urinary Bladder Are Involved in Patients with Upper Urinary Tract Urolithiasis – Clinical and Immunohistochemistry Study
PLoS ONE
IF0
Low-Temperature Vacuum Evaporation of Ammonia from Pig Slurry at Laboratory and Pilot-Plant Scale
Processes
IF0

