Canyam
AI summaries for academic research
Home
Literature Help
Subscribe
Favorites
Tools
Analysis
Summary
Patents
Not logged in
Back
J
Jyh‐Bin Yang
National Central University
25
H-index
92
Paper Count
1.9K
Citation Count
0
Related Insights
Subscribe
Published Papers
30
Publication Date
Publication Date
Impact Factor
Citations
Barriers to promoting sustainable prefabricated construction in immature markets using PLS-SEM and IPMA
Architectural Engineering and Design Management
IF
2.5
2025-07-31
0
PRE
AI
Veerakumar Rangasamy; Jyh-Bin Yang
Share
Save
AI-driven generative design and optimization in prefabricated construction
Automation in Construction
IF
11.5
2025-06-16
0
PRE
AI
Veerakumar Rangasamy; Jyh-Bin Yang
Share
Save
Incorporating stakeholder perception into risk assessment model: an empirical study of highway construction projects
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Vo, Huy Minh; Yang, Jyh-Bin
Share
Save
Interpreting crucial barriers to advancing prefabricated construction: An empirical study in Taiwan using ISM-MICMAC approach
JOURNAL OF CLEANER PRODUCTION
IF
10
2025-01-01
1
PRE
AI
Rangasamy, V; Yang, JB
Share
Save
The convergence of BIM, AI and IoT: Reshaping the future of prefabricated construction
JOURNAL OF BUILDING ENGINEERING
IF
7.4
2024-05-01
9
PRE
AI
Rangasamy, Veerakumar; Yang, Jyh-Bin
Share
Save
Enhanced ESM approach for duration forecasting in delayed projects
AIN SHAMS ENGINEERING JOURNAL
IF
5.9
2024-03-01
1
OA
AI
Yang, Jyh-Bin; Chen, Yu-Hsin
Share
Save
A comprehensive review of delay analysis techniques for solving concurrent delays
construction engineering and management
IF
3.9
2024-02-20
1
PRE
AI
Vo, Huy Minh; Yang, Jyh-Bin; Rangasamy, Veerakumar
Share
Save
THE BENEFIT EVALUATION FRAMEWORK OF USING PERFORMANCE-BAS ED CONTRACTING IN URBAN ROAD MAINTENANCE
management in engineering
IF
3.7
2024-02-13
0
OA
AI
Tseng, Chun-Chieh; Yang, Jyh-Bin
Share
Save
S-curve adjustment approaches for a force majeure event: COVID-19 as an example
construction engineering and management
IF
3.9
2023-10-20
0
PRE
AI
Yang, Jyh-Bin; Chen, Ying-Fu
Share
Save
Selecting EVM, ESM and EDM(t) for managing construction project schedule
construction engineering and management
IF
3.9
2023-06-16
4
PRE
AI
Yang, Jyh-Bin; Lai, Tzu-Hua
Share
Save
Subjective benefit evaluation model for immature BIM-enabled stakeholders
AUTOMATION IN CONSTRUCTION
IF
11.5
2019-10-01
33
PRE
AI
Yang, Jyh-Bin; Chou, Hung-Yu
Share
Save
Barriers to BIM implementation strategies in China
construction engineering and management
IF
3.9
2019-02-18
87
PRE
AI
Zhou, Yijun; Yang, Yu; Yang, Jyh-Bin
Share
Save
Mixed approach to government BIM implementation policy: An empirical study of Taiwan
JOURNAL OF BUILDING ENGINEERING
IF
7.4
2018-11-01
46
PRE
AI
Yang, Jyh-Bin; Chou, Hung-Yu
Share
Save
USING DATA ENVELOPMENT ANALYSIS TO SUPPORT BEST-VALUE CONTRACTOR SELECTION
management in engineering
IF
3.7
2015-08-24
34
OA
AI
Yang, Jyh-Bin; Wang, Han-Hsiang; Wang, Wei-Chih; Ma, Shin-Min
Share
Save
Benefit Analysis of Knowledge Management System for Engineering Consulting Firms
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2014-07-01
12
PRE
AI
Yang, Jyh-Bin; Yu, Wen-Der; Tseng, Judy C. R.; Chang, Chia-Shin; Chang, Pei-Lun; Wu, Ji-Wei
Share
Save
DEVELOPING COMPUTER-BASED SCHEDULE DELAY ANALYSIS METHODS BASED ON INFORMATION FLOW ANALYSIS: A CASE STUDY
management in engineering
IF
3.7
2013-10-24
9
OA
AI
Tsai, Ming-Kuan; Yang, Jyh-Bin; Yau, Nie-Jia
Share
Save
An Empirical Study of Schedule Delay Causes Based on Taiwan's Litigation Cases
international journal of project management
IF
4.4
2013-06-01
42
PRE
AI
Yang, Jyh-Bin; Chu, Mei-Yi; Huang, Kuei-Mei
Share
Save
An integrated proactive knowledge management model for enhancing engineering services
AUTOMATION IN CONSTRUCTION
IF
11.5
2012-07-01
20
PRE
AI
Wu, Ji-Wei; Tseng, Judy C. R.; Yu, Wen-Der; Yang, Jyh-Bin; Lee, Shun-Min; Tsai, Wen-Nung
Share
Save
Factors Causing Design Schedule Delays in Turnkey Projects in Taiwan: An Empirical Study of Power Distribution Substation Projects
international journal of project management
IF
4.4
2012-06-01
20
PRE
AI
Yau, Nie-Jia; Yang, Jyh-Bin
Share
Save
Critical path effect based delay analysis method for construction projects
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
IF
7.5
2012-04-01
55
PRE
AI
Yang, Jyh-Bin; Kao, Chih-Kuei
Share
Save
Research Directions
The data has not been retrieved yet.
Co-authors
Cooperation Journals
Y
Yu‐Hsin Chen
H-index: 26 · Papers: 129
Y
Yu Yang
H-index: 22 · Papers: 86
J
Judy C. R. Tseng
H-index: 22 · Papers: 94
Y
Yijun Zhou
H-index: 19 · Papers: 151
W
Wei-Chih Wang
H-index: 14 · Papers: 69
View more