Developing a Risk Management Process for Infrastructure Projects Using IDEF0

delete2021-06-21
delete8
delete
OA
AI
H
H. Ping Tserng *
I
I-Cheng Cho
C
Chun‐Hung Chen
Y
Yufan Liu
DOI:10.3390/su13126958delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
The Mass Rapid Transit (MRT) project is a massive, large-scale construction venture with a complex interface. In order to reduce the risk of disasters and industrial accidents in the project and to save costs, a simple and flexible risk management system is necessary for projects such as MRT. A set of risk management processes was identified through a literature review and data collection, and the Integration Definition for Function Modeling (IDEF0) process was used for logical analysis. The IDEF0 diagram clearly depicts the items to be delivered at each interface, and risk is reduced by facilitating the flow of data on various risk items. The results of this research will be applied to other practical projects, with special emphasis on the project planning and design stages. Future work will verify whether the implementation of the proposed risk management process does indeed effectively reduce risks in the completed project.
Keywords:
risk management
risk process
project management
IDEF0
risk system implementation
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

Sustainability cover
Sustainability
IF:
3.3
Papers:
10.7W
Citations:
28.4W

Organization

N
National Taiwan University
Scholars:
4.7W
Papers: 4.2W
Citations: 3.6W
Cited Papers

Cited Papers

Estrogen regulates sex-specific localization of regulatory T cells in adipose tissue of obese female mice
err2020-04-02
err0
errOAAI
errAkari Ishikawa; Tsutomu Wada; Sanshiro Nishimura; Tetsuo Ito; Akira Okekawa; Yasuhiro Onogi; Eri Watanabe; Azusa Sameshima; Tomoko Tanaka; Hiroshi Tsuneki; Shigeru Saito; Toshiyasu Sasaoka
errShare
errSave
EXPERIMENTAL AND CFD RESULTS ON THE CO2 DISTRIBUTION IN A SEMI CLOSED GREENHOUSE
err2014-05-01
err0
PREAI
errJ.C. Roy; J.B. Pouillard; T. Boulard; H. Fatnassi; A. Grisey
errShare
errSave
researcher View more