Canyam
Home
Literature Help
Subscribe
Favorites
Research Group
Tools
Analysis
Summary
Patents
Patent Payment
Patent Search
Not logged in
Back
Journal Details
J
Journal of Construction Engineering and Management
IF
5.1
Papers
5084
Citations
17664
Related Insights
0
subscribe
Journal Papers
5084
Related Insights
0
Journal Papers
5084
Publication Date
Publication Date
IF
Citations
Principal component analysis of factors influencing the choice of procurement methods for the procurement of construction materials in Ghana
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Obeng-Ahenkora, Nana Kwame; Danso, Humphrey; Kheni, Nongiba Alkanam
Share
Save
Ergonomic Risk Mitigation through Workforce Planning for Construction Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Tao, Yu; Hu, Hao; Xu, Feng; Zhang, Zhipeng
Share
Save
Flow Shop Scheduling for Prefabricated Components Production Considering Parallel Machines and Buffer Constraints
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Yu, Miao; Ruan, Wenxin; Zhou, Ying; Zhao, Yu
Share
Save
Technological advancements in multi-modal knowledge graphs for engineering management
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Zhang, Jingqi; Jiang, Shaohua
Share
Save
An activity-based lessons learned model to support scheduling decisions in construction
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Yilmaz, Anil; Akcay, Emre Caner; Dikmen, Irem; Birgonul, M. Talat
Share
Save
Leveraging BIM and time-cost-safety trade-off analysis for optimized decisions in construction projects
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Shams, Alia; Marzouk, Mohamed
Share
Save
Impact of COVID-19 on work and depressive symptoms among males in the Australian construction industry
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Lim, Huey Wen; Francis, Valerie
Share
Save
Decoding the Emergent Patterns of Cost of Quality through the Lens of Sociotechnical Systems: A Bibliometric Analysis
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Sharma, Nandini; Laishram, Boeing
Share
Save
Commodity futures pricing of carbon policy costs in construction projects
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Lu, Kun; Deng, Xueyuan; Cheng, Baoquan; Tam, Vivian W. Y.
Share
Save
Multilevel analysis of the scientific trajectory of BIM: insights from SciVal and cumulative capability development perspective
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Schery, Carlos Alejandro Diaz; Caiado, Rodrigo Goyannes Gusmao; Corseuil, Eduardo Thadeu; Neves, Hugo; Weibull, Jon Karl
Share
Save
A novel BIM maturity model integrating Industry 4.0 and sustainability: a design science research approach
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Schery, Carlos Alejandro Diaz; Caiado, Rodrigo Goyannes Gusmao; Corseuil, Eduardo Thadeu; Ivson, Paulo; Bueno, Adauto
Share
Save
An Improved YOLOv8-Dyhead-WiseIoU Model for Positioning and Counting Detection of Grouting Sleeves in a Prefabricated Wall
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Jiang, Ziyang; Han, Yu; Cheng, Yuyao; Wang, Ziping; Meng, Haining
Share
Save
Incorporating stakeholder perception into risk assessment model: an empirical study of highway construction projects
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Vo, Huy Minh; Yang, Jyh-Bin
Share
Save
Predicting cost overrun in construction projects using machine learning algorithms: the case of Jordan
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Hamdan, Mutaz Mohammad; Thneibat, Mujahed; Hyari, Khaled
Share
Save
Impacts of Physical and Informational Failures on Worker-Autonomy Trust in Future Construction
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Chang, Woei-Chyi; Esmaeili, Behzad; Hasanzadeh, Sogand
Share
Save
Comprehensive Evaluation of Grouting Effectiveness Combining Qualitative On-Site Tests and Improved Fuzzy Integration with Entropy Weight Method: Case Study of a Mountain Tunnel
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Sun, Runfang; Yan, Qixiang; Zhang, Chuan; Qiao, Minjie; Ren, Junnan
Share
Save
Modeling the Interdependencies between the Risk Factors Contributing to Preconstruction Delays in Construction Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
Charbel, Ghadi; Assaad, Rayan H.; Tejada, Tulio Rodriguez; Karaa, Fadi
Share
Save
An Ontological Knowledge-Driven Smart Contract Framework for Implicit Bridge Preservation Decision Making
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2025-04-01
0
PRE
AI
He, Chuanni; Liu, Min; Hsiang, Simon M.; Pierce, Nicholas; Megahed, Samuel; Godfrey, Asa
Share
Save
Impact of relational attitudes on collaborative innovation performance in building information modelling projects
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Liu, Jingjing; Zhang, Suxian
Share
Save
Untangling innovation diffusion in construction projects: a configural analysis of project attribute and corporate strategy
construction engineering and management
IF
3.9
2025-04-01
0
PRE
AI
Wang, Rubing; Li, Qian; Chong, Heap-Yih
Share
Save