DEVELOPING AS-BUILT BIM MODEL PROCESS MANAGEMENT SYSTEM FOR GENERAL CONTRACTORS: A CASE STUDY

delete2015-08-24
delete21
delete
OA
AI
Y
Yu‐Cheng Lin *
H
Hsin-Yun Lee
I
I‐Tung Yang
DOI:10.3846/13923730.2014.914081delete
deleteOriginal
deleteShare
deleteSave
View PDF
Abstract

Abstract

En 中文
As the application of building information modeling (BIM) becomes more common, BIM model management becomes necessary and important to enhance the effectiveness of BIM implementation for a general contractor (GC) during the construction phase. Implementation of BIM models in the construction phase, which typically involves participants from different fields, often has numerous BIM-related interfaces and problems. Therefore, feedback from the most recent as-built model tracking and BIM model problems are essential for BIM process management (BIM PM) in the construction field. BIM PM has become the most important aspect of a sound as-built BIM model management strategy. Changes in as-built BIM models should be identified, updated, and tracked for BIM PM, such that version management of as-built BIM models can be improved, while minimizing rework and reducing as-built BIM models development duration. Systematic approaches and information on management platforms for enhancing BIM PM during the construction phase are lacking. This study proposes a novel approach to the BIM model management which is to manage and track all versions of as-built BIM models. The primary purpose of this study is to develop a web Construction BIM-based PM (ConBIM-PM) system to enhance a General Contractor's ability to share BIM PM information and track construction projects more efficiently. The ConBIM-PM system provides users with a centralized storage of all versions of as-built models during the construction phase of a project so that they are able to track and manage the current status of modified as-built models and BIM PM information effectively. Finally, the ConBIM-PM system is applied to a case study of a building project in Taiwan to verify its efficacy and demonstrate its effectiveness. The case study results show that the ConBIM-PM system is effective for BIM PM work by a GC during the construction phase of the BIM implementation.
Keywords:
BIM
process management
building information modeling
information system
web-based system
BIM management
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Management in Engineering
IF:
7
Papers:
3.1K
Citations:
6.8K

Organization

N
national taiwan university of science & technology
Scholars:
8.8K
Papers: 8.7K
Citations: 9
N
National Taipei University of Technology
Scholars:
7.1K
Papers: 7.3K
Citations: 6.8K
N
national i-lan university
Scholars:
992
Papers: 1.3K
Citations: 0
researcher View more organizations
Cited Papers

Cited Papers

Construction safety and digital design: A review
err2012-03-01
err193
errOAAI
errZhou, Wei; Whyte, Jennifer; Sacks, Rafael
errShare
errSave
How to measure the benefits of BIM - A case study approach
err2012-07-01
err450
errOAAI
errBarlish, Kristen; Sullivan, Kenneth
errShare
errSave
IFC model viewer to support nD model application
err2006-03-01
err80
PREAI
errFu, CF; Aouad, G; Lee, A; Mashall-Ponting, A; Wu, S
errShare
errSave
Analysis of modeling effort and impact of different levels of detail in building information models
err2011-08-01
err154
PREAI
errLeite, Fernanda; Akcamete, Asli; Akinci, Burcu; Atasoy, Guzide; Kiziltas, Semiha
errShare
errSave
Subsurface Application Enhances Benefits of Manure Redistribution
err2016-02-01
err0
errOAAI
errJian Liu; Peter J. A. Kleinman; Douglas B. Beegle; Curtis J. Dell; Tamie L. Veith; Lou S. Saporito; Kun Han; Dan H. Pote; Ray B. Bryant
errShare
errSave
Aligning building information model tools and construction management methods
err2012-03-01
err172
PREAI
errHartmann, Timo; van Meerveld, Hendrik; Vossebeld, Niels; Adriaanse, Arjen
errShare
errSave
researcher View more