Incorporating practicability into genetic algorithm-based time-cost optimization

delete2002-04-01
delete32
PRE
AI
Q
Que, BC
DOI:10.1061/(ASCE)0733-9364(2002)128:2(139)delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
Optimization problems in construction scheduling, such as time-cost optimization, can be effectively solved using genetic algorithms (GAs). This paper presents an approach that makes GA-based time-cost optimization viable for real world problems. Practicability is incorporated through the integration of a project management system to the GA system. The approach takes advantage of the powerful scheduling functionality of the project management system in evaluating project completion dates during optimization. The approach ensures that all scheduling parameters, including activity relationships, lags, calendars, constraints, resources, and progress, are considered in determining the project completion date, thus allowing comprehensive and realistic evaluations to be made during optimization.
Keywords:
optimization
scheduling
construction management
algorithms
project management
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Construction Engineering and Management
IF:
5.1
Papers:
5.1K
Citations:
1.4W

Organization

No organization information available
Cited Papers

Cited Papers