arrow
Return

Memetic algorithm for solving resource constrained project scheduling problems

delete2020-03-01
delete66
PRE
AI
H
Humyun Fuad Rahman *
R
Ripon K. Chakrabortty
M
Michael J. Ryan
DOI:10.1016/j.autcon.2019.103052delete
deleteOriginal
deleteShare
deleteSave
Abstract

Abstract

En 中文
The resource constrained project scheduling problem (RCPSP) has a wide variety of practical applications in construction, manufacturing, project planning, and other areas. Since the 1960s many optimization algorithms have been proposed to solve this NP-hard problem, and their performances are evaluated in well-known test problems with different complexities. Although it is desirable to find an algorithm which can provide promising solutions with reasonable computational efforts for any problem under consideration, no single algorithm can meet that condition. To deal with this challenge, we present a genetic algorithm based memetic algorithm (MA) for solving RCPSP. The algorithm is initiated by a critical path-based heuristic and a variant of the Nawaz, Enscore, and Ham (NEH) heuristic. The algorithm involves a similar block order crossover and a variable insertion based local search. An automatic restart scheme is also presented which assists the algorithm to escape from local optima. In addition, a design-of-experiment (DOE) method is used to determine the set of suitable parameters for the proposed MA. Numerical results, statistical analysis and comparisons with state-of-the-art algorithms demonstrate the effectiveness of the proposed approach.
Keywords:
Project scheduling
Resource constrained
Makespan
Genetic algorithm
Memetic algorithm
A Memetic Algorithm for the Solution of the Resource Leveling Problem
err2023-10-30
err2
errOAAI
errIranagh, Mehdi; Sonmez, Rifat; Atan, Tankut; Uysal, Furkan; Bettemir, Onder Halis
errShare
errSave
Extensions of the resource-constrained project scheduling problem
err2023-09-01
err19
PREAI
errDing, Hongyan; Zhuang, Cunbo; Liu, Jianhua
errShare
errSave
errShare
errSave
Solving the project scheduling problem with dependent resource constraints
err2024-08-02
err0
PREAI
errLin, Chun-Wei R.; Lai, Yung Sheng; Jeng, Shiou-Yun; Hsiau, Hsian-Jong
errShare
errSave
An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem
err2021-01-01
err23
errOAAI
errAsadujjaman, Md.; Rahman, Humyun Fuad; Chakrabortty, Ripon K.; Ryan, Michael J.
errShare
errSave

Journal

Automation in Construction cover
Automation in Construction
IF:
11.5
Papers:
6.4K
Citations:
5.7W

Organization

No organization information available
Cited Papers

Cited Papers

Density map visualization as a tool to monitor activity levels of older adults
err2010-04-01
err0
PREAI
errG.L. Alexander; C. Galambos; M. Skubic; S. Wang
errShare
errSave
Mechanisms of Acantholysis in Pemphigus Vulgaris: Role of IgG Valence
err1997-10-01
err0
PREAI
errJosé M. Mascaró; Agustı́n España; Zhi Liu; Xiang Ding; Sue J. Swartz; Janet A. Fairley; Luis A. Diaz
errShare
errSave
Learning Deficits Induced by High-Calorie Feeding in the Rat are Associated With Impaired Brain Kynurenine Pathway Metabolism
err2022-07-10
err0
errOAAI
errCarla Elena Mezo-González; Amran Daher Abdi; Luis Antonio Reyes-Castro; Sandra Olvera Hernández; Clarissa Almeida; Mikaël Croyal; Audrey Aguesse; Elaine Cristina Gavioli; Elena Zambrano; Francisco Bolaños-Jiménez
errShare
errSave
A hybrid genetic algorithm for the resource-constrained project scheduling problem
err2008-03-01
err200
PREAI
errValls, Vicente; Ballestin, Francisco; Quintanilla, Sacramento
errShare
errSave
Clinical Study on Fluvoxamine Combined with Oxycodone Prolonged-Release Tablets in Treating Patients with Moderate to Severe Cancer Pain
err2015-01-06
err0
errOAAI
errYang Xiao; Jun Liu; Xin-En Huang; Li-Hua Ca; Yi-Min Ma; Wei Wei; Rong-Xia Zhang; Xiao-Hong Huang; Juan Chang; Yi-Jia Wu
errShare
errSave
researcher View more