arrow
Return

Multi-objective evolutionary algorithm based flexible assembly job-shop rescheduling with component sharing for order insertion

delete2024-09-01
delete3
PRE
AI
J
Jinghe Sun *
Z
Zhuo Zhang
G
Guohui Zhang
Z
Zhouchun Huang
DOI:10.1016/j.cor.2024.106744delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
This paper addresses a rescheduling problem in an order -driven flexible assembly job -shop, which encompasses a complete production line from machining to assembly. Some products have a multi -level assembly structure, and certain components can be shared among different products. When an order with tight delivery date is inserted, rescheduling is necessary for adjusting original production scheme and tradeoffs among makespan, total tardiness and count of machine changes. To formulate the flexible assembly job -shop rescheduling problem with component sharing (FAJRP-CS), a mixed -integer linear programming model is established. The model involves three categories of decision variables that determine the machine assignment, shared component allocation, and operation sequencing. Meanwhile, solution of FAJRP-CS is analyzed by using graph model, and a neighborhood structure containing two -type move for critical operations is proposed for local optimizing. Then, a hybrid nondominated sorting genetic algorithm with tabu search (NSGATS) is developed to maintain diversity while improving convergence. The approach is first compared with 8 algorithms on nine test instances, and the effectiveness of the operators, framework and neighborhood structure are discussed separately. Subsequently, NSGATS is applied to solve the multi -stage rescheduling problem in a medical device workshop with 6 products and 56 components. The experimental results demonstrate that NSGATS is effective for solving the FAJRP-CS.
Keywords:
Flexible assembly job -shop
Rescheduling optimization
Non -dominated sorting genetic algorithm
Tabu search
Graph model

Journal

C
Computers and Operations Research
IF:
4.3
Papers:
6.5K
Citations:
1.8W

Organization

No organization information available
Cited Papers

Cited Papers

errShare
errSave
A genetic algorithm for the Flexible Job-shop Scheduling Problem
err2008-10-01
err759
PREAI
errPezzella, F.; Morganti, G.; Ciaschetti, G.
errShare
errSave
errShare
errSave
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
err2019-05-01
err236
errOAAI
errGao, Kaizhou; Yang, Fajun; Zhou, MengChu; Pan, Quanke; Suganthan, Ponnuthurai Nagaratnam
errShare
errSave
VHH (nanobody) directed against human glycophorin A: A tool for autologous red cell agglutination assays
err2013-07-01
err0
PREAI
errIbrahim Habib; Dorota Smolarek; Claude Hattab; Magdalena Grodecka; Gholamreza Hassanzadeh-Ghassabeh; Serge Muyldermans; Sandrine Sagan; Carlos Gutiérrez; Syria Laperche; Caroline Le-Van-Kim; Yves Colin Aronovicz; Kazimiera Wasniowska; Stephane Gangnard; Olivier Bertrand
errShare
errSave
errShare
errSave
errShare
errSave
researcher View more