Object-oriented scheduling for repetitive projects with soft logics

delete2006-01-01
delete34
PRE
AI
S
Su-Ling Fan
H
H. Ping Tserng
DOI:10.1061/(ASCE)0733-9364(2006)132:1(35)delete
deleteOriginal
deleteOriginal request for help
deleteShare
deleteSave
Abstract

Abstract

En 中文
The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.
Keywords:
SIMULATION
AI Summary

AI Summary

Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.

Journal

J
Journal of Construction Engineering and Management
IF:
5.1
Papers:
5.1K
Citations:
1.4W

Organization

No organization information available