Return
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
DOI:10.1016/j.autcon.2008.04.002.png)
Abstract
En 中文
This paper deals with construction project scheduling. In the literature on the subject one can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance (LOB) charts and CMP/PERT network planning. The methods take into account several objective functions: the least cost, the least time, limited resources, work priorities, etc., both in the deterministic and probabilistic approach. The paper presents an analysis of the time/cost relationship, performed using time coupling method TCM III. A modified hybrid evolutionary algorithm (HEA) developed by Bozejko and Wodecki (A Hybrid Evolutionary Algorithm for Some Discrete Optimization Problems. IEEE Computer Society, 325-331, 2005) was used for optimization. (C) 2008 Elsevier B.V. All rights reserved.
Keywords:
Time coupling methods (TCM)
Hybrid evolutionary algorithm (HEA)
Time/cost relationship
AI Summary
Key information extracted from the uploaded paper, including a brief overview, abstract, background, key highlights, visual analysis, and future outlook.
Journal
IF:
11.5
Papers:
6.3K
Citations:
4.2W
Organization
Cited Papers
Microbicidal effects of weakly acidified chlorous acid water against feline calicivirus and Clostridium difficile spores under protein-rich conditions
PLOS ONE
IF0


