Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
G
G. Edward Gibson
Arizona State University
33
H-index
155
Paper Count
3.8K
Citation Count
0
Related Insights
Subscribe
Published Papers
36
Publication Date
Publication Date
Impact Factor
Citations
An Effective Earned Value Management System (EVMS) is a Team Sport
international journal of project management
IF
4.4
2024-02-15
1
PRE
AI
Aramali, Vartenie; Gibson, G. Edward; El Asmar, Mounir; Sanboskani, Hala
Share
Save
Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-06-01
6
OA
AI
Aramali, Vartenie; Gibson Jr, G. Edward; El Asmar, Mounir; Sanboskani, Hala
Share
Save
A novel approach for measuring the accuracy of front end engineering design
construction engineering and management
IF
3.9
2023-02-06
0
PRE
AI
Gibson Jr, G. Edward; El Asmar, Mounir; Yussef, Abdulrahman; Ramsey, David
Share
Save
Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-11-01
9
OA
AI
Gibson, G. Edward; Sanboskani, Hala; El Asmar, Mounir; Aramali, Vartenie
Share
Save
Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2022-05-01
22
OA
AI
Aramali, Vartenie; Sanboskani, Hala; Gibson, G. Edward; El Asmar, Mounir; Cho, Namho
Share
Save
Examining the Impact of Rate-of-Return Regulation on Capital Project Planning
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-08-01
1
PRE
AI
Sherman, Rachael; Gibson, G. Edward, Jr.; Merrow, Edward; Parrish, Kristen
Share
Save
Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2021-07-01
20
OA
AI
Aramali, Vartenie; Gibson, G. Edward; El Asmar, Mounir; Cho, Namho
Share
Save
Identifying Team Selection and Alignment Factors by Delivery Method for Transportation Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2019-10-01
9
PRE
AI
Bingham, Evan; Gibson, G. Edward, Jr.; El Asmar, Mounir
Share
Save
Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2019-09-01
21
PRE
AI
Yussef, Abdulrahman; Gibson, G. Edward; Asmar, Mounir El; Ramsey, David
Share
Save
Front-End Planning for Large and Small Infrastructure Projects: Comparison of Project Definition Rating Index Tools
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2018-07-01
46
PRE
AI
Elzomor, Mohamed; Burke, Rebekah; Parrish, Kristen; Gibson, G. Edward, Jr.
Share
Save
Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2018-06-01
9
PRE
AI
Bingham, Evan; Gibson, G. Edward, Jr.; El Asmar, Mounir
Share
Save
Scope Definition of Air Force Design and Construction Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2017-09-01
8
OA
AI
Dicks, Evan; Molenaar, Keith R.; Gibson, G. Edward, Jr.
Share
Save
Development of a Project Scope Definition and Assessment Tool for Small Industrial Construction Projects
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2017-07-01
66
PRE
AI
Collins, Wesley; Parrish, Kristen; Gibson, G. Edward, Jr.
Share
Save
Early-warning application for real-time detection of energy consumption anomalies in buildings
JOURNAL OF CLEANER PRODUCTION
IF
10
2017-04-01
22
PRE
AI
Chou, Jui-Sheng; Telaga, Abdi S.; Chong, Wai K.; Gibson, G. Edward, Jr.
Share
Save
Infrastructure Project Scope Definition Using Project Definition Rating Index
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2017-03-01
40
PRE
AI
Bingham, Evan; Gibson, G. Edward, Jr.
Share
Save
Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-09-01
23
PRE
AI
Ramsey, David; El Asmar, Mounir; Gibson, G. Edward, Jr.
Share
Save
GENE EDITING IN CHONDROCYTES USING CRISPR/CAS9
OSTEOARTHRITIS AND CARTILAGE
IF
9
2016-04-01
1
OA
AI
Gibson, G.; Yang, M.
Share
Save
Serum non-coding RNAs as biomarkers for osteoarthritis progression after ACL injury
OSTEOARTHRITIS AND CARTILAGE
IF
9
2012-12-01
45
OA
AI
Zhang, L.; Yang, M.; Marks, P.; White, L. M.; Hurtig, M.; Mi, Q-S.; Divine, G.; Gibson, G.
Share
Save
Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2012-01-01
148
PRE
AI
Shrestha, Pramen P.; O'Connor, James T.; Gibson, G. Edward, Jr.
Share
Save
A study of preproject planning and project success using ANNs and regression models
AUTOMATION IN CONSTRUCTION
IF
11.5
2010-05-01
68
PRE
AI
Wang, Yu-Ren; Gibson, G. Edward, Jr.
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
C
Carlos Caldas
H-index: 158 · Papers: 1.4K
B
Bruce Caterson
H-index: 73 · Papers: 368
G
George Divine
H-index: 61 · Papers: 330
L
Lawrence M. White
H-index: 56 · Papers: 271
J
Jui‐Sheng Chou
H-index: 56 · Papers: 234
View more