Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
A
Awad S. Hanna
university of wisconsin madison
35
H-index
216
Paper Count
3.9K
Citation Count
0
Related Insights
Subscribe
Published Papers
28
Publication Date
Publication Date
Impact Factor
Citations
How Can Conflicts with Supervisors or Coworkers Affect Construction Workers' Safety Performance on Site? Two Cross-Sectional Studies in North America
BUILDINGS
IF
3.1
2024-04-27
3
OA
AI
Chen, Yuting (Tina); Hyatt, Douglas; Shahi, Arash; Hanna, Awad; Safa, Mahdi
Share
Save
Defining the Success Status of Construction Projects Based on Quantitative Performance Metrics Thresholds
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2023-03-01
10
PRE
AI
Aboseif, Eyad; Hanna, Awad S. S.
Share
Save
Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach
construction engineering and management
IF
3.9
2023-02-20
1
PRE
AI
Aboseif, Eyad; Hanna, Awad S. S.
Share
Save
Development and Application of Performance Index for Comparative Assessment of Public Capital Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-02-01
4
PRE
AI
Labib, Youssef N.; Lotfallah, Wafik B.; Hanna, Awad S.; Boulos, Nabil W.
Share
Save
Comprehensive Model for Construction Readiness Assessment
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2021-01-01
10
PRE
AI
Ibrahim, Michael W.; Labib, Youssef; Veeramani, Dharmaraj; Hanna, Awad S.; Russell, Jeffrey
Share
Save
Quantitative Comparison of Project Performance between Project Delivery Systems
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-11-01
46
PRE
AI
Ibrahim, Michael W.; Hanna, Awad; Kievet, Dave
Share
Save
Quantitative Analysis of the Impacts of Out-of-Sequence Work on Project Performance
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-08-01
8
PRE
AI
Ibrahim, Michael W.; Hanna, Awad S.; Russell, Jeffrey S.; Abotaleb, Ibrahim S.; El-adaway, Islam H.
Share
Save
Comprehensive Analysis of Factors Associated with Out-of-Sequence Construction
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-07-01
5
PRE
AI
Ibrahim, Michael W.; Hanna, Awad S.; Russell, Jeffrey S.; Abotaleb, Ibrahim S.; El-adaway, Islam H.
Share
Save
Developing a Rating Score for Out-of-Sequence Construction
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2020-05-01
15
PRE
AI
Abotaleb, Ibrahim S.; El-adaway, Islam H.; Ibrahim, Michael W.; Hanna, Awad S.; Russell, Jeffrey S.
Share
Save
Causes, Early Warning Signs, and Impacts of Out-of-Sequence Construction: Expert-Based Survey Analysis
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2019-11-01
25
PRE
AI
Abotaleb, Ibrahim S.; El-adaway, Islam H.; Ibrahim, Michael W.; Hanna, Awad S.; Russell, Jeffrey S.
Share
Save
Modeling the performance of healthcare construction projects
construction engineering and management
IF
3.9
2019-07-08
9
PRE
AI
Iskandar, Karim A.; Hanna, Awad S.; Lotfallah, Wafik
Share
Save
Modeling Project Manager Competency: An Integrated Mathematical Approach
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-08-01
46
PRE
AI
Hanna, Awad S.; Ibrahim, Michael W.; Lotfallah, Wafik; Iskandar, Karim A.; Russell, Jeffrey S.
Share
Save
Evaluating Integrated Project Delivery Using the Project Quarterback Rating
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-01-01
83
PRE
AI
El Asmar, Mounir; Hanna, Awad S.; Loh, Wei-Yin
Share
Save
Mathematical Formulation of the Project Quarterback Rating: New Framework to Assess Construction Project Performance
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2014-08-01
13
PRE
AI
Hanna, Awad S.; Lotfallah, Wafik; Aoun, Diane G.; El Asmar, Mounir
Share
Save
State of Practice of Building Information Modeling in the Mechanical Construction Industry
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2014-01-01
59
PRE
AI
Boktor, John; Hanna, Awad; Menassa, Carol C.
Share
Save
Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2013-11-01
153
PRE
AI
El Asmar, Mounir; Hanna, Awad S.; Loh, Wei-Yin
Share
Save
State of Practice of Building Information Modeling in Mechanical and Electrical Construction Industries
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2013-10-01
48
PRE
AI
Hanna, Awad; Boodai, Fawaz; El Asmar, Mounir
Share
Save
Construction Risk Identification and Allocation: Cooperative Approach
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2013-09-01
33
PRE
AI
Hanna, Awad S.; Thomas, Greg; Swanson, Justin R.
Share
Save
Quantitative Methods for Design-Build Team Selection
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2010-08-01
40
PRE
AI
El Asmar, Mounir; Lotfallah, Wafik; Whited, Gary; Hanna, Awad S.
Share
Save
Development of automated change order impact detection and quantification system (Retraction of vol 18, pg 525, 2009)
AUTOMATION IN CONSTRUCTION
IF
11.5
2010-07-01
0
PRE
AI
Lee, Min-Jae; Ryoo, Boong Yeol; Sullivan, Kenneth T.; Hanna, Awad S.
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
L
Lawrence C. Bank
H-index: 45 · Papers: 228
W
Wei‐Yin Loh
H-index: 43 · Papers: 146
J
Jeffrey S. Russell
H-index: 40 · Papers: 280
C
Carol C. Menassa
H-index: 39 · Papers: 190
I
Islam H. El-adaway
H-index: 37 · Papers: 275
View more