Canyam
AI summaries for academic research
Home
Literature Help
Subscribe
Favorites
Tools
Analysis
Summary
Patents
Not logged in
Back
S
Shu‐Shun Liu
national yunlin university science & technology
12
H-index
29
Paper Count
716
Citation Count
0
Related Insights
Subscribe
Published Papers
12
Publication Date
Publication Date
Impact Factor
Citations
Optimization Model of Maintenance Scheduling Problem for Heritage Buildings with Constraint Programming
BUILDINGS
IF
3.1
2023-07-23
0
OA
AI
Liu, Shu-Shun; Utami, Putri; Budiwirawan, Agung; Arifin, Muhammad Faizal Ardhiansyah; Perdana, Fernanda Sarwatatwadhika
Share
Save
An Integrated Optimization Model for Life Cycle Pavement Maintenance Budgeting Problems
IEEE ACCESS
IF
3.6
2022-01-01
6
OA
AI
Liu, Shu-Shun; Arifin, Muhammad Faizal Ardhiansyah; Chen, Wei Tong
Share
Save
Relationships between Social Support, Social Status Perception, Social Identity, Work Stress, and Safety Behavior of Construction Site Management Personnel
SUSTAINABILITY
IF
3.3
2021-03-14
19
OA
AI
Huang, Ying-Hua; Sung, Chen-Yu; Chen, Wei Tong; Liu, Shu-Shun
Share
Save
Preventive Maintenance Model for National School Buildings in Indonesia Using a Constraint Programming Approach
SUSTAINABILITY
IF
3.3
2021-02-09
7
OA
AI
Liu, Shu-Shun; Faizal Ardhiansyah Arifin, Muhammad
Share
Save
MEASURING THE PERCEPTION OF SAFETY AMONG TAIWAN CONSTRUCTION MANAGERS
management in engineering
IF
3.7
2013-01-16
18
OA
AI
Chen, Wei Tong; Lu, Chun Sheng; Liu, Shu-Shun; Wang, Min-Shun
Share
Save
ANALYZING RELATIONSHIPS AMONG SUCCESS VARIABLES OF CONSTRUCTION PARTNERING USING STRUCTURAL EQUATION MODELING: A CASE STUDY OF TAIWAN'S CONSTRUCTION INDUSTRY
management in engineering
IF
3.7
2012-11-20
36
OA
AI
Chen, Wei Tong; Chen, Tung-Tsan; Lu, Chun Sheng; Liu, Shu-Shun
Share
Save
Optimizing linear project scheduling with multi-skilled crews
AUTOMATION IN CONSTRUCTION
IF
11.5
2012-07-01
80
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
Share
Save
Optimizing project selection and scheduling problems with time-dependent resource constraints
AUTOMATION IN CONSTRUCTION
IF
11.5
2011-12-01
67
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
Share
Save
Profit Optimization for Multiproject Scheduling Problems Considering Cash Flow
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2010-12-01
49
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
Share
Save
Construction rescheduling based on a manufacturing rescheduling framework
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-10-01
25
PRE
AI
Liu, Shu-Shun; Shih, Kuo-Chuan
Share
Save
Resource-constrained construction project scheduling model for profit maximization considering cash flow
AUTOMATION IN CONSTRUCTION
IF
11.5
2008-11-01
93
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
Share
Save
Optimization model for resource assignment problems of linear construction projects
AUTOMATION IN CONSTRUCTION
IF
11.5
2007-07-01
59
PRE
AI
Liu, Shu-Shun; Wang, Chang-Jung
Share
Save
Research Directions
The data has not been retrieved yet.
Co-authors
Cooperation Journals
W
Wei Tong Chen
H-index: 24 · Papers: 95
Y
Ying‐Hua Huang
H-index: 17 · Papers: 54
C
Chen-Yü Sung
H-index: 9 · Papers: 28
T
Tung-Tsan Chen
H-index: 9 · Papers: 30
C
Chang‐Jung Wang
H-index: 6 · Papers: 14
View more