Canyam
AI summaries for academic research
Home
Preprint
Subscribe
Favorites
Tools
Analysis
Summary
Not logged in
Back
G
Gunnar Lucko
Catholic University of America
18
H-index
117
Paper Count
1.4K
Citation Count
0
Related Insights
Subscribe
Published Papers
36
Publication Date
Publication Date
Impact Factor
Citations
An Alternative Representation of Project Activity Networks: Activity on Arcs and Nodes (AoAaN)
BUILDINGS
IF
3.1
2025-04-19
0
OA
AI
Grande-Gonzalez, Fernando; Ballesteros-Perez, Pablo; Gonzalez-Cruz, Maria Carmen; Lucko, Gunnar
Share
Save
Graphical Delay Tracking for Linear and Repetitive Schedules
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2024-08-01
0
PRE
AI
Triana-Granados, Karol Viviana; Bernard, Isabella Rose; Merlin, Alizee; Lucko, Gunnar; Ballesteros-Perez, Pablo
Share
Save
Game Theory Approach for Concurrent Delay Analysis
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2023-03-01
4
PRE
AI
Huynh, Huu T.; Lucko, Gunnar; Eid, Mohamed S.
Share
Save
Continuous earned value management with singularity functions for comprehensive project performance tracking and forecasting
AUTOMATION IN CONSTRUCTION
IF
11.5
2022-11-01
5
OA
AI
Ngo, Kiet A.; Lucko, Gunnar; Ballesteros-Perez, Pablo
Share
Save
Critical Duration Index: Anticipating Project Delays from Deterministic Schedule Information
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-11-01
3
OA
AI
Gonzalez-Cruz, Maria-Carmen; Ballesteros-Perez, Pablo; Lucko, Gunnar; Zhang, Jing-Xiao
Share
Save
Best Practices for Case Studies in Construction Engineering and Management Research
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-08-01
5
PRE
AI
Gomes Araujo, Lissa; Lucko, Gunnar
Share
Save
Forecasting Construction Project Performance with Momentum Using Singularity Functions in LPS
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2022-08-01
7
PRE
AI
Ezzeddine, Ali; Shehab, Lynn; Lucko, Gunnar; Hamzeh, Farook
Share
Save
Theoretical quantification of ripple effect of delays in network schedules via activity cruciality
AUTOMATION IN CONSTRUCTION
IF
11.5
2021-09-01
4
OA
AI
Lucko, Gunnar; Su, Yi; Thompson, Richard C.
Share
Save
Fuzzy Linear and Repetitive Scheduling for Construction Projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2021-03-01
12
PRE
AI
Katsuragawa, Clara Mariana; Lucko, Gunnar; Isaac, Shabtai; Su, Yi
Share
Save
Apportioning Contract Float with Voting Methods to Correlated Activities in Network Schedules to Protect Construction Projects from Delays
AUTOMATION IN CONSTRUCTION
IF
11.5
2020-10-01
9
OA
AI
Su, Yi; Lucko, Gunnar; Thompson, Richard C., Jr.
Share
Save
Forecasting Accuracy of In-Progress Activity Duration and Cost Estimates
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2020-09-01
4
PRE
AI
Ballesteros-Perez, Pablo; Sanz-Ablanedo, Enoc; Cerezo-Narvaez, Alberto; Lucko, Gunnar; Pastor-Fernandez, Andres; Otero-Mateo, Manuel; Pablo Contreras-Samper, Juan
Share
Save
Integrated Temporal-Spatial Model for Construction Plans with Boolean Logic Operators
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2018-04-01
8
PRE
AI
Su, Yi; Isaac, Shabtai; Lucko, Gunnar
Share
Save
Application of Voting Theory to the Float Ownership Problem
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2018-01-01
6
PRE
AI
Su, Yi; Lucko, Gunnar; Thompson, Richard C., Jr.
Share
Save
Singularity functions for continuous precedence relations and nonlinear activity-time-production functions
AUTOMATION IN CONSTRUCTION
IF
11.5
2017-07-01
10
PRE
AI
Hajdu, Miklos; Lucko, Gunnar; Su, Yi
Share
Save
Float Types in Construction Spatial Scheduling
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-12-01
6
PRE
AI
Said, Hisham M. M.; Lucko, Gunnar
Share
Save
Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions
AUTOMATION IN CONSTRUCTION
IF
11.5
2016-10-01
38
PRE
AI
Su, Yi; Lucko, Gunnar
Share
Save
Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: I. Conceptual Framework and Qualitative C-I-V-I-L Classification
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-10-01
4
PRE
AI
Duzkale, Abdulhamit Kayihan; Lucko, Gunnar
Share
Save
Exposing Uncertainty in Bid Preparation of Steel Construction Cost Estimating: II. Comparative Analysis and Quantitative C-I-V-I-L Classification
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-10-01
6
PRE
AI
Duzkale, Abdulhamit Kayihan; Lucko, Gunnar
Share
Save
Slip Chart-Inspired Project Schedule Diagramming: Links, Extension to Network Schedules, and Unification
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-07-01
0
PRE
AI
Araujo, Lissa Gomes; Lucko, Gunnar
Share
Save
Slip Chart-Inspired Project Schedule Diagramming: Origins, Buffers, and Extension to Linear Schedules
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2016-05-01
9
PRE
AI
Lucko, Gunnar; Araujo, Lissa Gomes; Cates, Grant R.
Share
Save
Research Directions
No research directions
Co-authors
Cooperation Journals
苏
苏益
(Yi Su)
H-index: 54 · Papers: 640
C
Christine M. Anderson‐Cook
H-index: 34 · Papers: 360
P
Pablo Ballesteros‐Pérez
H-index: 32 · Papers: 120
A
Ahmed Bouferguène
H-index: 29 · Papers: 178
F
Farook Hamzeh
H-index: 29 · Papers: 200
View more