arrow
R

Rui Zheng

Hefei University of Technology
H-index:15
Citation Count:684
Views:0

Biography

No content for now.

Education

No content for now.

Work Experience

No content for now.

Honors & Awards

No content for now.

An optimal sampling-inspection policy for a partially observable production process

部分可观测生产过程的最优抽样检验策略

2026-04-070
PRE
Multi-phase preventive maintenance policy for leased equipment considering the lessee’s demand information sharing

考虑承租人需求信息共享的租赁设备多阶段预防性维护策略

2026-04-010
PRE
Condition-based maintenance policy for a balanced system subject to random mission types

基于状态的平衡系统维护策略,适用于随机任务类型

2026-03-280
PRE
Health assessment for transmission wire ropes subject to dependent failure modes

适用于相关失效模式的输电钢丝绳健康评估

2026-01-130
PRE
Reliability analysis and maintenance optimization for systems with degradation-mitigation and shock-resistance subsystems

系统的可靠性分析与维护优化(针对具有退化缓解和抗冲击子系统的系统)

2025-12-200
PRE
Optimization of an adaptive mission abort policy for a partially observable system

部分可观测系统中自适应任务中止策略的优化

2025-11-110
PRE
Optimal Replacement for a Partially Observable System Subject to Dependent Failure Modes

部分可观测且受依赖失效模式影响的系统的最优替换

2025-10-012
PRE
An optimal self-healing policy with discrete resources

离散资源下的最优自愈策略

2025-06-190
PRE
Condition-based maintenance policy for a two-component balanced system with a multimode protective device

基于状态的维护策略:针对具有多模保护装置的双组件平衡系统

2025-06-190
PRE
Optimal condition-based replacement policy with unknown degradation parameters

基于未知退化参数的最优条件性更换策略

2025-06-090
PRE
Distributed maintenance task scheduling for multiple technician teams considering uncertain durations and deterioration effects towards Industry 5.0

面向工业5.0的多维修理工团队分布式维护任务调度,考虑不确定工期和劣化效应

2025-02-101
PRE
Economic design of a self-healing policy with limited agents
2025-01-010
PRE
A condition-based maintenance policy for a two-component balanced system with dependent degradation processes

具有相关退化过程的两组件平衡系统的基于状态的维护策略

2024-12-010
PRE
Integrated optimization of production scheduling and maintenance planning with dynamic job arrivals and mold constraints

具有动态作业到达和模具约束的生产计划和维护计划的集成优化

2023-12-013
PRE
Group Maintenance for Numerical Control Machine Tools: A Case Study
2023-12-018
PRE
A hybrid repair-replacement policy in the proportional hazards model

比例风险模型中的混合维修更换策略

2023-02-0126
PRE