Canyam
AI summaries for academic research
Home
Literature Help
Subscribe
Favorites
Tools
Analysis
Summary
Patents
Not logged in
Back
C
Celia A. Glass
city st georges, university of london
19
H-index
49
Paper Count
1.1K
Citation Count
0
Related Insights
Subscribe
Published Papers
16
Publication Date
Publication Date
Impact Factor
Citations
Perfect periodic scheduling for binary tree routing in wireless networks
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2015-12-01
8
OA
AI
Kim, Eun-Seok; Glass, Celia A.
Share
Save
Minimising the number of gap-zeros in binary matrices
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2013-08-01
2
OA
AI
Chakhlevitch, Konstantin; Glass, Celia A.; Shakhlevich, Natalia V.
Share
Save
Lot streaming multiple jobs in a flow shop
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2011-05-01
6
PRE
AI
Glass, Celia A.; Possani, Edgar
Share
Save
Batch machine production with perishability time windows and limited batch size
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2011-04-01
12
PRE
AI
Chakhlevitch, Konstantin; Glass, Celia A.; Kellerer, Hans
Share
Save
Alleviating bottlenecks in a microbiology laboratory
JOURNAL OF FOOD ENGINEERING
IF
5.8
2011-04-01
2
PRE
AI
Chakhlevitch, Konstantin; Gloss, Celia A.; Sadd, Peter A.
Share
Save
The nurse rostering problem: A critical appraisal of the problem structure
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2010-04-01
58
PRE
AI
Glass, Celia A.; Knight, Roger A.
Share
Save
Scheduling reentrant jobs on parallel machines with a remote server
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2009-09-01
6
OA
AI
Chakhlevitch, K.; Glass, C. A.
Share
Save
Bun splitting: a practical cutting stock problem
ANNALS OF OPERATIONS RESEARCH
IF
4.5
2008-11-13
4
OA
AI
Glass, Celia A.; van Oostrum, Jeroen M.
Share
Save
On the equivalence of small batch assembly line balancing and lot streaming in a flow shop
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
IF
7.3
2006-11-01
3
PRE
AI
Glass, Celia A.; Herer, Yale T.
Share
Save
Scheduling unit length jobs with parallel nested machine processing set restrictions
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2006-03-01
29
PRE
AI
Glass, CA; Mills, HR
Share
Save
Scheduling the production of two-component jobs on a single machine
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
2000-01-01
21
PRE
AI
Gerodimos, AE; Glass, CA; Potts, CN
Share
Save
Scheduling maintenance services to three machines
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1999-01-01
28
PRE
AI
Anily, S; Glass, CA; Hassin, R
Share
Save
Scheduling multi-operation jobs on a single machine
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1999-01-01
29
PRE
AI
Gerodimos, AE; Glass, CA; Potts, CN; Tautenhahn, T
Share
Save
A comparison of local search methods for flow shop scheduling
ANNALS OF OPERATIONS RESEARCH
IF
4.5
1996-08-01
22
PRE
AI
Glass, CA; Potts, CN
Share
Save
LOT STREAMING IN 3-STAGE PRODUCTION PROCESSES
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1994-06-01
69
PRE
AI
GLASS, CA; GUPTA, JND; POTTS, CN
Share
Save
FEASIBILITY OF SCHEDULING LOT SIZES OF 2 FREQUENCIES ON ONE MACHINE
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH
IF
6
1994-06-01
13
PRE
AI
GLASS, CA
Share
Save
Research Directions
The data has not been retrieved yet.
Co-authors
Cooperation Journals
J
Jatinder N.D. Gupta
H-index: 60 · Papers: 351
C
Chris N. Potts
H-index: 57 · Papers: 198
R
Refael Hassin
H-index: 46 · Papers: 255
H
Hans Kellerer
H-index: 35 · Papers: 153
S
Shoshana Anily
H-index: 25 · Papers: 56
View more