科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
U
Uday Kumar
Lulea University of Technology
28
H指数
108
论文数
2.8K
被引数
0
相关解读
订阅
收录论文
7
发表时间
发表时间
IF
被引数
Integrated optimization of train scheduling and maintenance planning on high-speed railway corridors
高速铁路通道列车调度与检修计划的综合优化
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2019-09-01
51
PRE
AI
Zhang, Chuntian; Gao, Yuan; Yang, Lixing; Kumar, Uday; Gao, Ziyou
分享
收藏
A Dynamic Prescriptive Maintenance Model Considering System Aging and Degradation
IEEE ACCESS
IF
3.6
2019-01-01
30
OA
AI
Liu, Bin; Lin, Jing; Zhang, Liangwei; Kumar, Uday
分享
收藏
A reliability decision framework for multiple repairable units
RELIABILITY ENGINEERING & SYSTEM SAFETY
IF
11
2016-06-01
39
PRE
AI
Garmabaki, A. H. S.; Ahmadi, Alireza; Block, Jan; Hoang Pham; Kumar, Uday
分享
收藏
Kernelized Proportional Intensity Model for Repairable Systems Considering Piecewise Operating Conditions
IEEE TRANSACTIONS ON RELIABILITY
IF
5.7
2012-09-01
2
PRE
AI
Yuan Fuqing; Kumar, Uday
分享
收藏
A General Imperfect Repair Model Considering Time-Dependent Repair Effectiveness
IEEE TRANSACTIONS ON RELIABILITY
IF
5.7
2012-03-01
33
PRE
AI
Yuan Fuqing; Kumar, Uday
分享
收藏
Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran
RELIABILITY ENGINEERING & SYSTEM SAFETY
IF
11
2008-04-01
168
PRE
AI
Barabady, Javad; Kumar, Uday
分享
收藏
Reliability improvement through alternative designs - A case study
RELIABILITY ENGINEERING & SYSTEM SAFETY
IF
11
2007-07-01
25
PRE
AI
Kumar, Saurabh; Chattopadhyay, Gopi; Kumar, Uday
分享
收藏
研究方向
暂无研究方向
合作学者
合作期刊
高
高自友
(Ziyou Gao)
H 指数: 68 · 论文数: 500
杨
杨立兴
(Lixing Yang)
H 指数: 60 · 论文数: 325
H
Hoang Pham
H 指数: 48 · 论文数: 336
刘
刘斌
(Bin Liu)
H 指数: 43 · 论文数: 372
高
高原
(Yuan Gao)
H 指数: 33 · 论文数: 117
查看更多