科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
E
Ekambaram Palaneeswaran
indian institute of technology (iit) - madras
27
H指数
127
论文数
2.0K
被引数
0
相关解读
订阅
收录论文
20
发表时间
发表时间
IF
被引数
Review and Insights Toward Cognitive Digital Twins in Pavement Assets for Construction 5.0
面向建设5.0的路面资产认知数字孪生的回顾与见解
INFRASTRUCTURES
IF
2.9
2025-03-15
1
OA
AI
Oditallah, Mohammad; Alam, Morshed; Ekambaram, Palaneeswaran; Ranjha, Sagheer
分享
收藏
Evaluating the effect of normative feedback on energy conservation in a shared space
ENERGY AND BUILDINGS
IF
7.1
2023-04-01
7
PRE
AI
Zhu, Jiaolan; Alam, Md Morshed; Liu, Rongsheng; Wang, Jiayuan; Ding, Zhikun; Ekambaram, Palaneeswaran
分享
收藏
The influence of group-level factors on individual energy-saving behaviors in a shared space: The case of shared residences
群体层面因素对共享空间中个体节能行为的影响 -- 以共享住宅为例
JOURNAL OF CLEANER PRODUCTION
IF
10
2021-08-01
21
PRE
AI
Zhu, Jiaolan; Alam, Md Morshed; Ding, Zhikun; Ekambaram, Palaneeswaran; Li, Jie; Wang, Jiayuan
分享
收藏
Multi-resource scheduling and routing for emergency recovery operations
INTERNATIONAL JOURNAL OF DISASTER RISK REDUCTION
IF
4.5
2020-11-01
26
OA
AI
Bodaghi, Behrooz; Shahparvari, Shahrooz; Fadaki, Masih; Lau, Kwok Hung; Ekambaram, Palaneeswaran; Chhetri, Prem
分享
收藏
Probabilistic allocation and scheduling of multiple resources for emergency operations; a Victorian bushfire case study
COMPUTERS ENVIRONMENT AND URBAN SYSTEMS
IF
8.3
2020-05-01
22
PRE
AI
Bodaghi, Behrooz; Palaneeswaran, Ekambaram; Shahparvari, Shahrooz; Mohammadi, Mahsa
分享
收藏
Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem
construction engineering and management
IF
3.9
2019-11-11
17
PRE
AI
Kannimuthu, Marimuthu; Raphael, Benny; Ekambaram, Palaneeswaran; Kuppuswamy, Ananthanarayanan
分享
收藏
Bi-objective multi-resource scheduling problem for emergency relief operations
PRODUCTION PLANNING & CONTROL
IF
5.4
2019-01-24
26
PRE
AI
Bodaghi, Behrooz; Palaneeswaran, Ekambaram; Abbasi, Babak
分享
收藏
Reduce rework, improve safety: an empirical inquiry into the precursors to error in construction
PRODUCTION PLANNING & CONTROL
IF
5.4
2018-01-15
55
OA
AI
Love, Peter E. D.; Teo, Pauline; Ackermann, Fran; Smith, Jim; Alexander, James; Palaneeswaran, Ekambaram; Morrison, John
分享
收藏
Satisfaction of residents on public housings built before and after implementation of ISO9000
HABITAT INTERNATIONAL
IF
7
2011-01-01
11
PRE
AI
Ng, S. Thomas; Palaneeswaran, Ekambaram; Kumaraswamy, Mohan M.
分享
收藏
Improving megaproject briefing through enhanced collaboration with ICT
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-11-01
42
PRE
AI
Chung, Jacky K. H.; Kumaraswamy, Mohan M.; Palaneeswaran, Ekambaram
分享
收藏
Factors contributing to the success of equipment-intensive subcontractors in construction
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT
IF
7.5
2009-10-01
48
PRE
AI
Ng, S. Thomas; Tang, Ziwei; Palaneeswaran, Ekambaram
分享
收藏
A support vector machine model for contractor prequalification
承包商资格预审的支持向量机模型
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-05-01
72
PRE
AI
Lam, Ka Chi; Palaneeswaran, Ekambaram; Yu, Chen-yun
分享
收藏
Mapping rework causes and effects using artificial neural networks
BUILDING RESEARCH AND INFORMATION
IF
3.4
2008-10-01
45
PRE
AI
Palaneeswaran, Ekambaram; Love, Peter E. D.; Kumaraswamy, Mohan M.; Ng, Thomas S. T.
分享
收藏
An integrated decision support system for dealing with time extension entitlements
AUTOMATION IN CONSTRUCTION
IF
11.5
2008-05-01
28
PRE
AI
Palaneeswaran, Ekambaram; Kumaraswamy, Mohan M.
分享
收藏
Client satisfaction and quality management systems in contractor organizations
承包商组织中的客户满意度和质量管理体系
BUILDING AND ENVIRONMENT
IF
7.6
2006-11-01
27
PRE
AI
Palaneeswaran, Ekambaram; Ng, Thomas; Kumaraswamy, Mohan
分享
收藏
Synergising R&D initiatives for e-enhancing management support systems
AUTOMATION IN CONSTRUCTION
IF
11.5
2006-11-01
9
PRE
AI
Kumaraswamy, Mohan M.; Palaneeswaran, Ekambaram; Rahman, M. Motiar; Ugwu, Onuegbu O.; Ng, S. Thomas
分享
收藏
Knowledge mining of information sources for research in construction management
面向施工管理研究的信息源知识挖掘
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2003-04-01
9
PRE
AI
Palaneeswaran, E; Kumaraswamy, MM
分享
收藏
Curing congenital construction industry disorders through relationally integrated supply chains
BUILDING AND ENVIRONMENT
IF
7.6
2003-04-01
75
PRE
AI
Palaneeswaran, E; Kumaraswamy, M; Rahman, M; Ng, T
分享
收藏
A dynamic e-Reporting system for contractor's performance appraisal
ADVANCES IN ENGINEERING SOFTWARE
IF
5.7
2002-06-01
14
PRE
AI
Ng, ST; Palaneeswaran, E; Kumaraswamy, MM
分享
收藏
Recent advances and proposed improvements in contractor prequalification methodologies
承包商资格预审方法的最新进展和拟议改进
BUILDING AND ENVIRONMENT
IF
7.6
2001-01-01
83
PRE
AI
Palaneeswaran, E; Kumaraswamy, M
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
P
Peter E.D. Love
H 指数: 109 · 论文数: 788
S
S. Thomas Ng
H 指数: 69 · 论文数: 515
J
Jiayuan Wang
H 指数: 56 · 论文数: 266
M
Mohan M. Kumaraswamy
H 指数: 53 · 论文数: 350
K
K.C. Lam
H 指数: 43 · 论文数: 186
查看更多