科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
C
Chou-Jung Hsu
national yunlin university science & technology
21
H指数
48
论文数
1.2K
被引数
0
相关解读
订阅
收录论文
15
发表时间
发表时间
IF
被引数
Resource constrained scheduling problems with general truncated sum-of-processing time dependent effect under single machine and unrelated parallel machines
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2017-08-01
7
PRE
AI
Zhang, Xingong; Lin, Win-Chin; Hsu, Chou-Jung; Wu, Chin-Chia
分享
收藏
Note on a unified approach to the single-machine scheduling problem with a deterioration effect and convex resource allocation
JOURNAL OF MANUFACTURING SYSTEMS
IF
14.2
2016-01-01
13
PRE
AI
Zhao, Chuanli; Hsu, Chou-Jung; Wu, Wen-Hsiang; Cheng, Shuenn-Ren; Wu, Chin-Chia
分享
收藏
Due date assignment and single machine scheduling with deteriorating jobs to minimize the weighted number of tardy jobs
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2014-12-01
17
PRE
AI
Zhao, Chuanli; Hsu, Chou-Jung; Cheng, Shuenn-Ren; Yin, Yunqiang; Wu, Chin-Chia
分享
收藏
Single-machine batch delivery scheduling with an assignable common due window
具有可分配公共到期窗口的单机批量交货计划
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE
IF
7.2
2013-04-01
75
PRE
AI
Yin, Yunqiang; Cheng, T. C. E.; Hsu, Chou-Jung; Wu, Chin-Chia
分享
收藏
A branch-and-bound procedure for a single-machine earliness scheduling problem with two agents
APPLIED SOFT COMPUTING
IF
6.6
2013-02-01
30
PRE
AI
Yin, Yunqiang; Wu, Chin-Chia; Wu, Wen-Hsiang; Hsu, Chou-Jung; Wu, Wen-Hung
分享
收藏
Unrelated parallel-machine scheduling with aging effects and multi-maintenance activities
具有老化效应和多维护活动的不相关并行机调度
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2012-07-01
61
PRE
AI
Yang, Dar-Li; Cheng, T. C. E.; Yang, Suh-Jenq; Hsu, Chou-Jung
分享
收藏
Note on Unrelated parallel-machine scheduling with deteriorating maintenance activities
关于维护活动恶化的不相关并行机调度的注释
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2012-05-01
2
PRE
AI
Yang, Suh-Jenq; Hsu, Chou-Jung; Yang, Dar-Li
分享
收藏
Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness
具有恶化作业和设置时间的单机调度,以最大限度地减少最大的迟到
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2011-12-01
31
PRE
AI
Cheng, T. C. E.; Hsu, Chou-Jung; Huang, Yi-Chi; Lee, Wen-Chiung
分享
收藏
Some unrelated parallel machine scheduling problems with past-sequence-dependent setup time and learning effects
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-08-01
34
PRE
AI
Kuo, Wen-Hung; Hsu, Chou-Jung; Yang, Dar-Li
分享
收藏
Unrelated parallel-machine scheduling with deteriorating maintenance activities
维护活动恶化的不相关并行机调度
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-05-01
57
PRE
AI
Cheng, T. C. E.; Hsu, Chou-Jung; Yang, Dar-Li
分享
收藏
Two due date assignment problems with position-dependent processing time on a single-machine
在单机上具有位置相关处理时间的两个到期日分配问题
COMPUTERS & INDUSTRIAL ENGINEERING
IF
6.5
2011-05-01
20
PRE
AI
Hsu, Chou-Jung; Yang, Suh-Jenq; Yang, Dar-Li
分享
收藏
A modified particle swarm optimization algorithm for a single-machine scheduling problem with periodic maintenance
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2010-09-01
33
PRE
AI
Low, Chinyao; Hsu, Chou-Jung; Su, Chwen-Tzeng
分享
收藏
A single-machine scheduling problem with maintenance activities to minimize makespan
APPLIED MATHEMATICS AND COMPUTATION
IF
3.4
2010-02-01
30
PRE
AI
Hsu, Chou-Jung; Low, Chinyao; Su, Chwen-Tzeng
分享
收藏
A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2008-03-01
41
PRE
AI
Low, Chinyao; Hsu, Chou-Jung; Su, Chwen-Tzeng
分享
收藏
A two-machine flowshop scheduling problem with a separated maintenance constraint
COMPUTERS & OPERATIONS RESEARCH
IF
4.3
2008-03-01
39
PRE
AI
Yang, Dar-Li; Hsu, Chou-Jung; Kuo, Wen-Hung
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
T
T.C.E. Cheng
H 指数: 96 · 论文数: 1.5K
C
Chin‐Chia Wu
H 指数: 45 · 论文数: 242
Y
Yunqiang Yin
H 指数: 43 · 论文数: 247
W
Wen‐Chiung Lee
H 指数: 38 · 论文数: 96
S
Shuenn‐Ren Cheng
H 指数: 25 · 论文数: 99
查看更多