科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
J
José Luis Ponz‐Tienda
Universitat Politecnica de Valencia
15
H指数
29
论文数
707
被引数
0
相关解读
订阅
收录论文
8
发表时间
发表时间
IF
被引数
Identification of Factors Affecting the Performance of Rural Road Projects in Colombia
SUSTAINABILITY
IF
3.3
2020-09-09
6
OA
AI
Gomez-Cabrera, Adriana; Sanz-Benlloch, Amalia; Montalban-Domingo, Laura; Ponz-Tienda, Jose Luis; Pellicer, Eugenio
分享
收藏
Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects
建设项目重复活动调度的多目标线性规划优化模型
AUTOMATION IN CONSTRUCTION
IF
11.5
2019-09-01
46
PRE
AI
Diego Garcia-Nieves, Juan; Luis Ponz-Tienda, Jose; Ospina-Alvarado, Angelica; Bonilla-Palacios, Mateo
分享
收藏
The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
建设项目中重复活动的多模式资源受限项目调度问题
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
IF
9.1
2018-03-06
51
OA
AI
Garcia-Nieves, J. D.; Ponz-Tienda, J. L.; Salcedo-Bernal, A.; Pellicer, E.
分享
收藏
Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags
改进的自适应和声搜索算法,用于解决最小滞后的资源均衡问题
AUTOMATION IN CONSTRUCTION
IF
11.5
2017-05-01
34
OA
AI
Ponz-Tienda, J. L.; Salcedo-Bernal, A.; Pellicer, E.; Beniloch-Marco, J.
分享
收藏
A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
IF
9.1
2016-11-09
32
OA
AI
Ponz-Tienda, J. L.; Salcedo-Bernal, A.; Pellicer, Eugenio
分享
收藏
The Fuzzy Project Scheduling Problem with Minimal Generalized Precedence Relations
具有最小广义优先关系的模糊项目调度问题
COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING
IF
9.1
2015-08-20
35
OA
AI
Luis Ponz-Tienda, Jose; Pellicer, Eugenio; Benlloch-Marco, Javier; Andres-Romano, Carlos
分享
收藏
The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm
使用自适应遗传算法的具有多个资源的资源均衡问题
AUTOMATION IN CONSTRUCTION
IF
11.5
2013-01-01
71
OA
AI
Luis Ponz-Tienda, Jose; Yepes, Victor; Pellicer, Eugenio; Moreno-Flores, Joaquin
分享
收藏
Complete fuzzy scheduling and fuzzy earned value management in construction projects
zhejiang university science b
IF
3.9
2012-01-03
28
OA
AI
Luis Ponz-Tienda, Jose; Pellicer, Eugenio; Yepes, Victor
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
V
Víctor Yepes
H 指数: 51 · 论文数: 495
E
Eugenio Pellicer
H 指数: 37 · 论文数: 213
L
Laura Montalbán-Domingo
H 指数: 18 · 论文数: 82
J
Javier Benlloch Marco
H 指数: 13 · 论文数: 39
C
Carlos Andrés Romano
H 指数: 10 · 论文数: 118
查看更多