科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
A
Alistair Gibb
Loughborough University
41
H指数
216
论文数
1.1W
被引数
0
相关解读
订阅
收录论文
24
发表时间
发表时间
IF
被引数
Interface management of offsite bathroom construction: a conceptual model
CONSTRUCTION INNOVATION-ENGLAND
IF
3.5
2022-04-20
3
OA
AI
McCarney, Michael; Goodicr, Chris Ian; Gibb, Alistair
分享
收藏
Going underground: Fatigue and sleepiness in tunnelling operations
APPLIED ERGONOMICS
IF
3.4
2021-01-01
10
OA
AI
Maynard, Sally; Jones, Wendy; Filtness, Ashleigh; Gibb, Alistair; Haslam, Roger
分享
收藏
The use of actor-based immersive health and safety inductions: Lessons from the Thames Tideway Tunnel megaproject
使用基于演员的身临其境的健康与安全诱导: 泰晤士泰德威隧道大项目的经验教训
APPLIED ERGONOMICS
IF
3.4
2020-01-01
6
OA
AI
Harvey, Eleanor J.; Pinder, James A.; Haslam, Roger A.; Dainty, Andrew R. J.; Gibb, Alistair G.
分享
收藏
Design for occupational safety and health: key attributes for organisational capability
职业安全与健康设计: 组织能力的关键属性
construction engineering and management
IF
3.9
2019-05-10
41
OA
AI
Manu, Patrick; Poghosyan, Anush; Mahamadu, Abdul-Majeed; Mahdjoubi, Lamine; Gibb, Alistair; Behm, Michael; Akinade, Olugbenga O.
分享
收藏
Applying a longitudinal tracer methodology to evaluate complex interventions in complex settings
应用纵向示踪方法评估复杂环境中的复杂干预
EUROPEAN JOURNAL OF WORK AND ORGANIZATIONAL PSYCHOLOGY
IF
3.4
2019-04-22
2
OA
AI
Fuller, Paul; Randall, Ray; Dainty, Andrew; Haslam, Roger; Gibb, Alistair
分享
收藏
Performance-based seismic design of steel structures accounting for fuzziness in their joint flexibility
SOIL DYNAMICS AND EARTHQUAKE ENGINEERING
IF
4.6
2018-12-01
8
OA
AI
di Roseto, Alessandro de Luca; Palmeri, Alessandro; Gibb, Alistair G.
分享
收藏
Building healthy construction workers: Their views on health, wellbeing and better workplace design
APPLIED ERGONOMICS
IF
3.4
2016-05-01
92
OA
AI
Eaves, S.; Gyi, D. E.; Gibb, A. G. F.
分享
收藏
Analysis of construction accidents in Spain, 2003-2008
JOURNAL OF SAFETY RESEARCH
IF
4.4
2012-12-01
134
OA
AI
Lopez Arquillos, Antonio; Rubio Romero, Juan Carlos; Gibb, Alistair
分享
收藏
Strategies for Integrating the Use of Off-Site Production Technologies in House Building
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2012-11-01
163
OA
AI
Pan, Wei; Gibb, Alistair G. F.; Dainty, Andrew R. J.
分享
收藏
Establishing and Weighting Decision Criteria for Building System Selection in Housing Construction
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2012-11-01
115
OA
AI
Pan, Wei; Dainty, Andrew R. J.; Gibb, Alistair G. F.
分享
收藏
Hardened properties of high-performance printing concrete
CEMENT AND CONCRETE RESEARCH
IF
13.1
2012-03-01
701
OA
AI
Le, T. T.; Austin, S. A.; Lim, S.; Buswell, R. A.; Law, R.; Gibb, A. G. F.; Thorpe, T.
分享
收藏
Mix design and fresh properties for high-performance printing concrete
MATERIALS AND STRUCTURES
IF
3.9
2012-01-19
828
PRE
AI
Le, T. T.; Austin, S. A.; Lim, S.; Buswell, R. A.; Gibb, A. G. F.; Thorpe, T.
分享
收藏
Developments in construction-scale additive manufacturing processes
建筑规模增材制造工艺的发展
AUTOMATION IN CONSTRUCTION
IF
11.5
2012-01-01
804
OA
AI
Lim, S.; Buswell, R. A.; Le, T. T.; Austin, S. A.; Gibb, A. G. F.; Thorpe, T.
分享
收藏
Ethnographic methodologies for construction research: knowing, practice and interventions
BUILDING RESEARCH AND INFORMATION
IF
3.4
2010-12-01
108
OA
AI
Pink, Sarah; Tutt, Dylan; Dainty, Andrew; Gibb, Alistair
分享
收藏
Health and Safety Management within Small- and Medium-Sized Enterprises (SMEs) in Developing Countries: Study of Contextual Influences
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2010-10-01
81
PRE
AI
Kheni, Nongiba A.; Gibb, Alistair G. F.; Dainty, Andrew R. J.
分享
收藏
Towards an autonomous real-time tracking system of near-miss accidents on construction sites
AUTOMATION IN CONSTRUCTION
IF
11.5
2010-03-01
163
PRE
AI
Wu, Weiwei; Yang, Huanjia; Chew, David A. S.; Yang, Shuang-hua; Gibb, Alistair G. F.; Li, Qiming
分享
收藏
New build: Materials, techniques, skills and innovation
ENERGY POLICY
IF
9.2
2008-12-01
58
OA
AI
Glass, Jacqueline; Dainty, Andrew R. J.; Gibb, Alistair G. F.
分享
收藏
Design, data and process issues for mega-scale rapid manufacturing machines used for construction
AUTOMATION IN CONSTRUCTION
IF
11.5
2008-11-01
77
PRE
AI
Buswell, R. A.; Thorpe, A.; Soar, R. C.; Gibb, A. G. F.
分享
收藏
Leading UK housebuilders' utilization of offsite construction methods
BUILDING RESEARCH AND INFORMATION
IF
3.4
2008-01-01
156
PRE
AI
Pan, Wei; Gibb, Alistair G. F.; Dainty, Andrew R. J.
分享
收藏
Freeform construction: Mega-scale rapid manufacturing for construction
自由形式建筑: 大型建筑快速制造
AUTOMATION IN CONSTRUCTION
IF
11.5
2007-03-01
356
OA
AI
Buswell, R. A.; Soar, R. C.; Gibb, A. G. F.; Thorpe, A.
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
A
Andrew Dainty
H 指数: 66 · 论文数: 425
Wei Pan
(Wei Pan)
H 指数: 56 · 论文数: 326
S
Sarah Pink
H 指数: 50 · 论文数: 411
S
Simon A. Austin
H 指数: 46 · 论文数: 295
李启明
(Qiming Li)
H 指数: 44 · 论文数: 290
查看更多