科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
S
Samuel Yen-Liang Yin
National Taiwan University
16
H指数
38
论文数
809
被引数
0
相关解读
订阅
收录论文
11
发表时间
发表时间
IF
被引数
Seismic performance of large-scale rectangular reinforced concrete bridge columns with multi-spiral reinforcement
大型矩形钢筋混凝土桥柱多螺旋钢筋的抗震性能
EARTHQUAKE SPECTRA
IF
3.7
2023-07-17
1
PRE
AI
Wang, Ping-Hsiung; Chang, Kuo-Chun; Yin, Samuel Yen-Liang; Wang, Jui-Chen; Sung, Yu-Chi; Hung, Hsiao-Hui
分享
收藏
Simplified Finite-Element Analysis Method for Axial Compression Behavior of Rectangular Concrete Columns with Interlocking Multispiral Reinforcements
JOURNAL OF STRUCTURAL ENGINEERING
IF
3.9
2020-01-01
8
PRE
AI
Wang, Ping-Hsiung; Chang, Kuo-Chun; Yin, Samuel Yen-Liang; Wang, Jui-Chen; Ou, Yu-Chen
分享
收藏
AN IMPROVED APPROACH TO THE SUBCONTRACTING PROCUREMENT PROCESS IN A LEAN CONSTRUCTION SETTING
management in engineering
IF
3.7
2014-06-09
19
PRE
AI
Yin, Samuel Yen-Liang; Tserng, H. Ping; Shih Ning Toong; Thanh Long Ngo
分享
收藏
Contractor financial prequalification using simulation method based on cash flow model
基于现金流模型的承包商财务资格预审模拟方法
AUTOMATION IN CONSTRUCTION
IF
11.5
2013-11-01
14
PRE
AI
Huang, Wen-Haw; Tserng, H. Ping; Liao, Hsien-Hsing; Yin, Samuel Y. L.; Chen, Po-Cheng; Lei, Man Cheng
分享
收藏
A production modeling with genetic algorithms for a stationary pre-cast supply chain
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2010-12-01
32
OA
AI
Li, Sherman H. A.; Tserng, H. Ping; Yin, Samuel Y. L.; Hsu, Ching-Wen
分享
收藏
THE USE OF KNOWLEDGE MAP MODEL IN CONSTRUCTION INDUSTRY
management in engineering
IF
3.7
2010-09-30
24
OA
AI
Tserng, H. Ping; Yin, Samuel Yen-Liang; Lee, Meng-Hsueh
分享
收藏
A study of ontology-based risk management framework of construction projects through project life cycle
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-11-01
117
PRE
AI
Tserng, H. Ping; Yin, Samuel Y. L.; Dzeng, R. J.; Wou, B.; Tsai, M. D.; Chen, W. Y.
分享
收藏
Developing a precast production management system using RFID technology
AUTOMATION IN CONSTRUCTION
IF
11.5
2009-08-01
119
PRE
AI
Yin, Samuel Y. L.; Tserng, H. Ping; Wang, J. C.; Tsai, S. C.
分享
收藏
A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan
AUTOMATION IN CONSTRUCTION
IF
11.5
2008-07-01
14
PRE
AI
Yin, Samuel Y. L.; Tserng, H. Ping; Tsai, M. D.
分享
收藏
Closure to Developing a Resource Supply Chain Planning System or Construction Projects by H. Ping Tserng, Samuel Y. L. Yin, and Sherman H. A. Li
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2008-05-01
2
PRE
AI
Tserng, H. Ping; Yin, Samuel Y. L.; Sherman, H. A. U.
分享
收藏
Developing a resource supply chain planning system for construction projects
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2006-04-01
48
PRE
AI
Tserng, HP; Yin, SYL; Li, S
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
K
Kuo‐Chun Chang
H 指数: 34 · 论文数: 141
P
Po‐Cheng Chen
H 指数: 29 · 论文数: 70
Y
Yu‐Chen Ou
H 指数: 27 · 论文数: 104
H
H. Ping Tserng
H 指数: 25 · 论文数: 123
R
Ren‐Jye Dzeng
H 指数: 21 · 论文数: 86
查看更多