科言猫
学术研究的AI总结
首页
文献互助
订阅
我的收藏
科研工具
选题分析
论文总结
专利管理
未登录
返回
H
H. Ping Tserng
national taiwan university
25
H指数
123
论文数
2.2K
被引数
0
相关解读
订阅
收录论文
41
发表时间
发表时间
IF
被引数
Automated bridge scour depth estimation using UAV-enabled wireless vibration sensing and finite element inversion
基于UAV无线振动传感和有限元反演的桥梁冲刷深度自动估计
Automation in Construction
IF
11.5
2026-06-10
0
PRE
AI
Ching-Wei Chen; Lun-Wang Wu; Hui-Ping Tserng; Ping-Jui Wu
分享
收藏
Predicting the construction duration of an offshore wind farm in Taiwan based on available weather windows: a case study of the Formosa 2 offshore wind farm
基于可用天气窗口预测台湾海上风电场的建设工期:以福尔摩沙2号海上风电场为例
Journal of the Chinese Institute of Engineers
IF
1.2
2026-01-01
0
PRE
AI
Tserng, Hui-Ping; Chiu, Tsu-Hsien; Guo, Sy-Jye
分享
收藏
Integration of IoT and machine learning for enhancing physiological workload management of tunnel construction workers
物联网与机器学习集成以增强隧道施工人员生理工作负荷管理
Computer-Aided Civil and Infrastructure Engineering
IF
9.1
2025-08-06
0
OA
AI
Lun-Wang Wu; Hui-Ping Tserng; Xiu-Zhen Huang; Wei-Cheng Chen; Han-Fei Lin
分享
收藏
A Contingency Model of Strategic Responses to the Institutional Challenges in Emerging Countries: Evidence and Findings from Least Developed Countries
JOURNAL OF MANAGEMENT IN ENGINEERING
IF
7
2023-07-01
3
PRE
AI
Ho, S. Ping; Dahal, Rameshwar; Tserng, Hui-Ping
分享
收藏
Using a Unique Retaining Method for Building Foundation Excavation: A Case Study on Sustainable Construction Methods and Circular Economy
BUILDINGS
IF
3.1
2022-03-03
4
OA
AI
Liu, Tai-Yi; Ho, Shiau-Jing; Tserng, Hui-Ping; Tzou, Hong-Kee
分享
收藏
Real-time individual workload management at tunnel worksite using wearable heart rate measurement devices
使用可穿戴式心率测量设备在隧道工地进行实时个人工作量管理
AUTOMATION IN CONSTRUCTION
IF
11.5
2022-02-01
14
PRE
AI
Chen, Wei-Cheng; Tserng, H. Ping
分享
收藏
Developing a Risk Management Process for Infrastructure Projects Using IDEF0
SUSTAINABILITY
IF
3.3
2021-06-21
8
OA
AI
Tserng, Hui-Ping; Cho, I-Cheng; Chen, Chun-Hung; Liu, Yu-Fan
分享
收藏
The Key Strategies to Implement Circular Economy in Building Projects-A Case Study of Taiwan
SUSTAINABILITY
IF
3.3
2021-01-14
39
OA
AI
Tserng, H. -Ping; Chou, Cheng-Mo; Chang, Yun-Tsui
分享
收藏
THE MEASUREMENT FACTOR OF EMPLOYEE PARTICIPATION FOR KNOWLEDGE MANAGEMENT SYSTEM IN ENGINEERING CONSULTING FIRMS
management in engineering
IF
3.7
2015-08-27
10
OA
AI
Tserng, H. Ping; Lee, Meng-Hsueh; Hsieh, Shang-Hsien; Liu, Hsiang-Ling
分享
收藏
Strategic governance for modeling institutional framework of public-private partnerships
CITIES
IF
6.6
2015-02-01
22
PRE
AI
Chou, Jui-Sheng; Tserng, H. Ping; Lin, Chieh; Huang, Wen-Haw
分享
收藏
Dynamic Threshold Cash Flow-Based Structural Model for Contractor Financial Prequalification
基于动态门限现金流的承包商财务资格预审结构模型
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2014-10-01
6
PRE
AI
Huang, Wen-Haw; Tserng, H. Ping; Jaselskis, Edward J.; Lee, Shu-Yi
分享
收藏
AN IMPROVED APPROACH TO THE SUBCONTRACTING PROCUREMENT PROCESS IN A LEAN CONSTRUCTION SETTING
management in engineering
IF
3.7
2014-06-09
19
PRE
AI
Yin, Samuel Yen-Liang; Tserng, H. Ping; Shih Ning Toong; Thanh Long Ngo
分享
收藏
PREDICTION OF DEFAULT PROBABILITY FOR CONSTRUCTION FIRMS USING THE LOGIT MODEL
management in engineering
IF
3.7
2014-04-10
34
OA
AI
Tserng, H. Ping; Chen, Po-Cheng; Huang, Wen-Haw; Lei, Man Cheng; Tran, Quang Hung
分享
收藏
DEVELOPING BIM-ASSISTED AS-BUILT SCHEDULE MANAGEMENT SYSTEM FOR GENERAL CONTRACTORS
management in engineering
IF
3.7
2014-03-10
32
OA
AI
Tserng, Hui-Ping; Ho, Shih-Ping; Jan, Shu-Hui
分享
收藏
Contractor financial prequalification using simulation method based on cash flow model
基于现金流模型的承包商财务资格预审模拟方法
AUTOMATION IN CONSTRUCTION
IF
11.5
2013-11-01
14
PRE
AI
Huang, Wen-Haw; Tserng, H. Ping; Liao, Hsien-Hsing; Yin, Samuel Y. L.; Chen, Po-Cheng; Lei, Man Cheng
分享
收藏
Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects
TRANSPORT POLICY
IF
5.3
2012-07-01
117
PRE
AI
Chou, Jui-Sheng; Tserng, H. Ping; Lin, Chieh; Yeh, Chun-Pin
分享
收藏
Predicting Construction Contractor Default with Barrier Option Model
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT
IF
5.1
2012-05-01
21
OA
AI
Tserng, H. Ping; Liao, Hsien-Hsing; Jaselskis, Edward J.; Tsai, L. Ken; Chen, Po-Cheng
分享
收藏
A novel dynamic progress forecasting approach for construction projects
EXPERT SYSTEMS WITH APPLICATIONS
IF
7.5
2012-02-01
12
PRE
AI
Lin, M. Chiao; Tserng, H. Ping; Ho, S. Ping; Young, D. L.
分享
收藏
An enforced support vector machine model for construction contractor default prediction
AUTOMATION IN CONSTRUCTION
IF
11.5
2011-12-01
54
OA
AI
Tserng, H. Ping; Lin, Gwo-Fong; Tsai, L. Ken; Chen, Po-Cheng
分享
收藏
Modularization and assembly algorithm for efficient MEP construction
AUTOMATION IN CONSTRUCTION
IF
11.5
2011-11-01
32
OA
AI
Tserng, H. Ping; Yin, Y. L.; Jaselskis, Edward J.; Hung, Wu-Chueh; Lin, Yi-Chieh
分享
收藏
研究方向
暂时未获取到该数据
合作学者
合作期刊
J
Jui‐Sheng Chou
H 指数: 56 · 论文数: 234
B
Bin Ran
H 指数: 53 · 论文数: 537
J
Jeffrey S. Russell
H 指数: 40 · 论文数: 280
C
Chun‐Hung Chen
H 指数: 35 · 论文数: 299
G
Gwo‐Fong Lin
H 指数: 34 · 论文数: 133
查看更多